Case Study

Remedial Excavation & Bank Restoration, Calgary

7,000 tonnes removed from a historic landfill on the Bow River bank. Bioengineered bank restoration and fish habitat enhancement followed.

Download case study PDF

01

Remedial Excavation & Bank Restoration, Calgary

2020

Capability Applied

Environmental Construction→

01

Site background and materials

7,000 tonnes of contaminated material removed from a historic landfill on the Bow River bank, followed by bioengineered bank restoration and fish habitat enhancement.

Site
Historic landfill on the Bow River bank, Calgary
Client
Residential property owner (confidential)
Materials
Historic landfill debris and contaminated material
Location
Bow River bank, Calgary

02

Nelson's role and project scope

Prime contractor: care and control of full project

Scope
Excavation; Silt curtain isolation; Bioengineered bank restoration; Fish habitat enhancement

03

Equipment, handling and logistics

Silt curtain isolated the work area from the Bow River.

Excavation completed within a restricted activity period.

Native channel bed excavated behind the curtain for riprap toe protection.

Bank restored using vegetated soil wraps and hedge brush layers.

Large woody debris and rootwads installed for fish habitat.

Native seed, shrubs and trees planted for revegetation.

Volume
Approx. 7,000 tonnes excavated

04

Site controls and project requirements

A silt curtain isolated the work area from the Bow River, and excavation was completed within a restricted activity period. Native channel bed behind the curtain was excavated for riprap toe protection.

05

Documented outcomes

The bank was stabilized and revegetated with native seed, shrubs and trees. Large woody debris and rootwads enhanced fish habitat.

Result
Bank stabilized and revegetated; fish habitat enhanced
Completed
2020
Safety
Zero lost-time injuries

See all Earthworks projects →

See thermal projects →

Remediation Strategy Navigator

Start from a site like this one

For remediation and treatment decisions, answer five questions about your site and the Strategy Navigator will show which treatment paths your conditions point toward.

· A shortlist of treatment paths ranked against your answers

· The reasoning behind every technology that surfaces

· A shareable link that reopens the same strategy

· A downloadable strategy brief at the end

Open the Strategy Navigator

Outputs are indicative. Reach out for site-specific refinements.

Contact

How can Earthworks help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

Tap anywhere to hear the score

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson