The Ground Truth · June 18, 2026

Over thirty years of permanent outcomes: a field review of Nelson’s project record

By

Warren Nelson

, CEO & Co-Founder

June 18, 2026

Newsletter · Published monthly on LinkedIn

Welcome to the first issue of The Ground Truth. I have spent more than thirty years asking what it takes to remediate contaminated land responsibly and verify the result. Our project record offers a practical place to begin.

A record built in the field

For the first issue of The Ground Truth, I thought it would be good to answer that question with our record of the work.

I have chosen projects that cover mobile remediation at scale, remote logistics, persistent organics, Indigenous partnership, industrial circularity and international deployment. Each project needs to be read against its own material profile, approvals and verification record.

Tioga, North Dakota: scale and the science that followed

The Tioga pipeline spill cleanup treated approximately 1.2 million tons of hydrocarbon-impacted soil by mobile thermal desorption on site. No soil was sent to landfill. The work took place in an agricultural community where returning land to use mattered.

The technical work was only part of the assignment. Winter conditions, limited infrastructure, coordination with landowners and regulators, and careful preservation of topsoil all shaped the project. The phrase I carried forward was “go slow to go fast”: invest in communication and planning so that the field work is built on trust.

North Dakota State University researchers studied the physical, chemical, agronomic and microbial response of thermally treated soil. The research record now extends beyond the early papers to a four-year field assessment and a seven-year synthesis.

The findings show successful contaminant reduction and recovery over time, with important limits. Topsoil blending, fertility management and continued monitoring contribute to reclamation; treatment does not instantly restore every soil property.

Bear Hills, Louis bull First Nation: land and community priorities

At Bear Hills in Alberta, Nelson treated 140,000 tonnes of hydrocarbon-contaminated soil from a legacy fuel retail site on Louis bull First Nation land, with excavation, thermal treatment and site restoration. Environment Journal named the work to its 2026 Top 25 Projects in Canada list.

Indigenous land and community priorities are central to the work. The project record and award background explain the treatment and restoration undertaken.

American Samoa: a test of mobility

The AUA Tank Farm in American Samoa involved 16,000 tons of hydrocarbon-contaminated soil at a remote Pacific island site. Equipment was staged from Oakland and shipped across the Pacific, with operating systems adapted to tropical conditions.

The soil was treated to the applicable hydrocarbon criteria and the site was redeveloped for residential use. This is a practical example of what mobile means: bringing an appropriate treatment system to a place with substantial logistical constraints.

Geraldton, Ontario: persistent organics in a remote setting

At a remote Ontario gold mine, Nelson treated 24,000 tonnes of PCB and hydrocarbon-impacted soil under an Ontario Environmental Compliance Approval. The approved project record describes the mobile thermal treatment and destruction of persistent organic contaminants.

This work illustrates how equipment, approvals, material characterization and verification must fit the specific site.

Honolulu: returning a brownfield to use

Nelson remediated 25,000 tons of hydrocarbon-contaminated soil at a legacy fuel storage brownfield in Honolulu. The site was subsequently redeveloped for commercial use.

Brownfield redevelopment makes the purpose of remediation tangible. The treated land becomes useful again, with a project-specific record supporting that outcome.

Mill scale: circularity at industrial scale

At an operating steel facility in eastern Canada, Nelson treated 80,000 tonnes of oil-impacted mill scale. The recovered ferrous material returned to steel production, while recovered oil became recycled fuel.

This project demonstrates treatment and recovery working together. The intended uses of both output streams were integral to the process.

Western Canada: multi-site delivery

A western Canadian oil and gas program involved 95,000 tonnes of hydrocarbon-impacted soil across a primary site and three satellite sites, with deep excavation and restoration of the natural area.

The lesson is consistent: experienced crews, coordinated excavation and treatment, and a clear verification plan matter as much as the equipment.

PFAS and biosolids: evidence still developing

Municipal biosolids and other PFAS-bearing materials present a different challenge from hydrocarbons. Nelson’s PFAS work is pilot-validated, with further testing needed to establish performance for the specific material, compounds and operating conditions.

A pilot is an evaluation, not a universal destruction claim. Any project decision needs the approved analytical results, emissions and residuals assessment, and applicable regulatory requirements.

Vietnam: legacy dioxin residues

Nelson thermal desorption equipment has been deployed to Vietnam to address legacy dioxin residues. The project’s commissioning, operating conditions and verification requirements determine the treatment outcome.

International deployment demonstrates the logistical reach of the mobile thermal mobile fleet. It does not replace site-specific approvals or an approved operating result.

NATO STO PFAS test-bed participation

Nelson is a NATO STO PFAS test-bed participant. Controlled testing evaluates the technology and contributes evidence about performance under the conditions studied.

Participation is distinct from partnership, product certification or a guarantee of complete destruction. Public performance claims must remain tied to the approved results.

What the record shows

Across more than thirty years of work, mobility, engineering, verification and field responsibility remain central. The projects range from remote Pacific treatment to a large agricultural cleanup in North Dakota.

The research record shows why reclamation deserves attention alongside contaminant reduction. Verification must be interpreted within the jurisdiction and scope that apply to the project.

I believe the next thirty years will matter more than the last thirty. PFAS, biosolids, legacy dioxin residues and mixed waste streams will require careful evaluation of treatment, recovery, disposal and containment options.

I am grateful to the clients, communities and Nelson team members who built this record with us, and equally grateful for what we are being trusted to do next. Because tomorrow matters.

Subscribe on LinkedIn

Sources and further reading

Tioga, North Dakota

Bear Hills, Alberta

American Samoa

Ontario PCB project

Honolulu brownfield

Mill scale recovery

Western Canadian remediation

Vietnam deployment

NATO STO test-bed record

Read the original LinkedIn edition

More from The Ground Truth

The Ground Truth newsletter

Start with the full picture

The Ground TruthWhat is Warren Nelson's Ground Truth newsletter?

A new era of enlightenmentA new era of enlightenment

Value should be the final outcomeValue should be the final outcome

What’s next at NelsonWhat’s next at Nelson

Why independent research matters more than anythingWhy independent research matters more than anything

Read Next

Project Case Study•2026Tioga: Anatomy of a Cleanup

Project Case Study•2026Bear Hills: Ground Returned

Recognition•2026Bear Hills Named to Top 25 Projects in Canada, 2026

Back to Articles Main Page

Stay Informed

Get Nelson updates in your inbox

Project milestones, regulatory developments, and technical briefs. One email at a time. No noise.

Read Next

  • Tioga: Anatomy of a Cleanup
  • Bear Hills: Ground Returned
  • Bear Hills Named to Top 25 Projects in Canada, 2026

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner
  • PFAS Remediation Using Mobile High-Temperature Destruction Systems

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson