Case Study
Demolition, UST removal and impacted soil excavation at a retail fuel site. Neighbouring businesses stayed open throughout.
01
2023
Capability Applied
01
Demolition, underground tank removal and impacted soil excavation at a retail fuel site, with neighbouring businesses kept open and safely accessible throughout.
02
Prime contractor: care and control throughout
03
Canopy, building and pump islands demolished; asphalt and concrete recycled.
USTs inerted, excavated and decommissioned.
PHC-impacted soil hot-loaded and hauled to a Class 2 landfill.
Excavation water removed as it recharged.
Clean fill compacted to 98% SPMDD and paving matched to grade.
04
Neighbouring businesses remained open and safely accessible while demolition, tank removal and excavation proceeded. Excavation water was removed as it recharged, and backfill was compacted to 98% SPMDD.
05
Project liabilities were managed and the property was returned to specification, with neighbouring businesses kept open and safely accessible throughout.
Remediation Strategy Navigator
For remediation and treatment decisions, answer five questions about your site and the Strategy Navigator will show which treatment paths your conditions point toward.
· A shortlist of treatment paths ranked against your answers
· The reasoning behind every technology that surfaces
· A shareable link that reopens the same strategy
· A downloadable strategy brief at the end
Outputs are indicative. Reach out for site-specific refinements.
Contact
Project inquiries, technical consultation, or emergencies.
We respond to project inquiries within one business day.
Nelson Environmental Remediation
Head Office
30541 - 100 Avenue
Acheson (Edmonton), Alberta
Canada T7X 6L8
Phone
Toll Free: 1.888.960.8222
Fax
1.780.962.6885