Case Study

Well-Site Excavation, Rocky Mountain Foothills

Difficult terrain, year-round road bans and freeze/thaw cycles. We delivered 90,000 tonnes through the toughest conditions.

Download case study PDF

01

Well-Site Excavation, Rocky Mountain Foothills

2026

Capability Applied

Energy, Oil & Gas→

01

Site background and materials

90,000 tonnes of PHC and salt impacted soil excavated from sloped embankments at a remote well site, through freeze/thaw cycles, year-round road bans and landfill volume limits.

Site
Remote well site on sloped Rocky Mountain Foothills terrain, Alberta
Client
Major oil and gas producer (confidential)
Contaminants
Petroleum hydrocarbons (PHC) and salts

02

Nelson's role and project scope

General contractor: management, crew, equipment and trucking

Scope
Excavation and load-out; Off-site haulage; Road construction; Backfill and restoration

03

Equipment, handling and logistics

Contaminated soil excavated from sloped embankments to a depth of approximately 10 m.

Approximately 75% travelled 8 km on a temporary haul road with grades up to 11% before reaching the highway.

The remainder used a local paved road with pilot escort due to width restrictions.

Disposal divided among three landfills to stay within each facility's limits.

Night hauling took advantage of overnight freeze; pilot trucks were used under the 75% road ban.

Backfill hauled 2 km on a purpose-built borrow haul road with 150 m of elevation change.

Approximately 10,000 tonnes of extra material were used to keep haul roads passable.

Equipment
3 excavators, 2 dozers, 2 graders, loader, water truck, 4 rock trucks, padfoot packer, up to 20 haul trucks
Volume
Approx. 90,000 tonnes excavated and hauled; 70,000 tonnes backfill managed

04

Site controls and project requirements

Freeze/thaw cycles, year-round road bans and landfill volume limits shaped the hauling plan. Night hauling used overnight freeze conditions, while pilot trucks supported movement under road restrictions.

05

Documented outcomes

Borrow pits and the access road were recontoured, approximately 2,000 tonnes of topsoil were replaced, and the site was hydroseeded.

Result
Borrow pits and access road recontoured, approximately 2,000 tonnes of topsoil replaced and site hydroseeded
Completed
2026
Safety
Zero lost-time injuries

See all Earthworks projects →

See thermal projects →

Remediation Strategy Navigator

Start from a site like this one

For remediation and treatment decisions, answer five questions about your site and the Strategy Navigator will show which treatment paths your conditions point toward.

· A shortlist of treatment paths ranked against your answers

· The reasoning behind every technology that surfaces

· A shareable link that reopens the same strategy

· A downloadable strategy brief at the end

Open the Strategy Navigator

Outputs are indicative. Reach out for site-specific refinements.

Contact

How can Earthworks help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

Tap anywhere to hear the score

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson