Nelson Environmental Remediation - Slave Lake shored excavation remediation
4,800 tonnes of hydrocarbon and VOC impacted soil removed through a 7 m shored excavation behind a cantilever secant wall in Slave Lake.
4,800 tonnes of hydrocarbon and VOC impacted soil removed through a 7 m shored excavation behind a cantilever secant wall in Slave Lake.