Nelson Environmental Remediation - Southern Alberta 3-D GPS-guided remediation

96,000 tonnes of impacted soil removed from slopes up to 40° using 3-D GPS-guided excavation in Southern Alberta.

Nelson Earthworks used GPS-equipped excavators following a sub-surface delineation model, with off-highway trucks moving soil to purpose-built containment and transload facilities. The wellhead, artesian spring and drainage were protected throughout, and final grading was completed. The project record covers the excavation, haulage and site controls.