Nelson at RemTech 2026 | Banff | October 14–16

Proven remediation. Measurable outcomes.

Nelson Environmental Remediation is bringing more than three decades of field experience to RemTech 2026 in Banff, Alberta.

Join Nelson President Darryl Nelson as he presents the Louis Bull First Nation remediation project, a major Alberta project involving approximately 140,000 tonnes of hydrocarbon-contaminated soil treated to Alberta Tier 1 criteria and returned to the site for redevelopment.

Explore the Louis Bull Project

RemTech 2026 | Remediation Technologies Symposium

Banff, Alberta

October 14–16, 2026

Darryl Nelson, President | Presenter

140,000

tonnes treated

Featured at RemTech 2026

140,000 tonnes. Treated. Returned. Reclaimed.

At Louis Bull First Nation in Alberta, Nelson treated approximately 140,000 tonnes of hydrocarbon-contaminated soil to Alberta Tier 1 criteria.

Rather than becoming a long-term disposal problem, the treated soil was returned to the site for redevelopment.

The project demonstrates what large-scale mobile remediation can accomplish when treatment is brought directly to the contaminated material.

Explore the Louis Bull First Nation Project

Hydrocarbon-contaminated soil treated.

Treatment criteria achieved.

Treated soil returned for redevelopment.

Darryl Nelson

PresidentNelson Environmental Remediation

RemTech 2026 presentation

The Louis Bull First Nation remediation project.

At RemTech 2026, Nelson President Darryl Nelson will share the story of the Louis Bull First Nation remediation project and the experience behind one of Canada’s significant contaminated-soil treatment projects.

The presentation provides an opportunity to examine a real remediation challenge at scale and the role mobile thermal treatment played in returning treated material to the site.

View the RemTech 2026 Program

Press release | October 6, 2026

Nelson to present 140,000-tonne Alberta remediation project at RemTech 2026

Edmonton environmental remediation company will share results from major Louis Bull First Nation project at national industry gathering in Banff

EDMONTON, AB, October 6, 2026. Nelson Environmental Remediation will present the results of a major Alberta remediation project at RemTech 2026 in Banff, where industry leaders from across Canada will gather to examine advances and significant projects in contaminated-site remediation.

Nelson President Darryl Nelson will participate in “Top Remediation Projects: The biggest cleanup projects across Canada,” sharing the story of the Louis Bull First Nation remediation project in Alberta.

The project involved approximately 140,000 tonnes of hydrocarbon-contaminated soil, which Nelson treated to CCME criteria employing onsite thermal desorption remediation.

Rather than hauling the soil offsite, Nelson remediated the soil onsite with thermal desorption, enhancing the geotechnical quality for land redevelopment. Soil processing occurred during winter months, delivering warm clean soil for site restoration and achieving compaction specifications unattainable with other remediation methods, accelerating the construction schedule of the Bear Hills Casino.

“The project celebrated entering our 4th decade delivering large-scale sustainable remediation technology onsite achieving preservation of soil for highest value land reuse,” said Darryl Nelson, President of Nelson Environmental Remediation. “The Louis Bull project demonstrated the many advantages of thermal desorption technology delivered onsite.”

RemTech 2026 takes place October 14–16 at the Fairmont Banff Springs in Banff, Alberta. Organized by the Environmental Services Association of Alberta, the annual symposium brings together environmental professionals, regulators, researchers and technology providers working in soil and groundwater remediation.

Nelson Environmental Remediation will also be exhibiting at the conference.

About Nelson Environmental Remediation

Nelson Environmental Remediation is a leading Edmonton-based environmental remediation company specializing in the treatment of contaminated soil and groundwater. With more than three decades of field experience, Nelson provides mobile thermal remediation, in-situ remediation, resource recovery and environmental earthworks capabilities for industrial, government and Indigenous clients across Canada and internationally. For more, visit NelsonRemediation.com.

Media inquiries: Michael Donovan, Michael.donovan@nerglobal.com, Nelson Environmental Remediation, Edmonton, Alberta.

Read the standalone press release

Thermal remediation

Bring the treatment to the problem.

Moving contaminated material is not the same as eliminating contamination.

Nelson’s mobile thermal systems bring treatment technology to or near the source, allowing contaminated soils and other materials to be processed where project conditions make on-site or regional treatment the better approach.

Nelson operates direct-fired and indirect thermal technologies engineered around different contaminants, materials and project objectives.

Direct-Fire Thermal

High-capacity mobile thermal treatment for contaminated soils and other suitable materials, engineered for field deployment and large-scale remediation.

Explore Direct-Fire Thermal

Indirect Thermal

Controlled thermal processing for materials and applications where separation, recovery or specific process conditions require indirect heating.

Explore Indirect Thermal

Proven in the field

Experience measured in outcomes.

Louis Bull First Nation, Alberta

140,000 tonnes

Approximately 140,000 tonnes of hydrocarbon-contaminated soil treated to Alberta Tier 1 criteria and returned to the site for redevelopment.

Tioga, North Dakota

1.2 million tonnes

Approximately 1.2 million tonnes of Bakken crude-impacted soil thermally treated on site and returned to agricultural production.

Eastern Canada

80,000 tonnes

Approximately 80,000 tonnes of oil-impacted mill scale treated through indirect thermal desorption, recovering oil for reuse and returning ferrous material to production.

Explore Nelson Case Studies

Reclamation. Recycling. Recovery.

Remediation does not always have to end with disposal.

Depending on the material and project, thermal treatment can create opportunities to return treated soil to productive use, recover hydrocarbons or preserve materials that still have value.

Nelson’s approach considers the outcome as well as the contaminant: what can be eliminated, what can be recovered and what can safely return to use.

Reclamation

Louis Bull First Nation

Treated soil returned to the site for redevelopment.

Recycling

Treated materials

Treatment strategies designed to support approved reuse where site conditions, material characteristics and applicable requirements allow.

Recovery

Eastern Canada mill scale

Oil recovered for reuse while ferrous material was returned to production.

Explore Resource Recovery

Resource recovery

Some waste streams still contain value.

Industrial residuals can contain hydrocarbons, minerals and other materials worth recovering. Nelson combines thermal technology with application-specific processing to explore opportunities for contaminant destruction, material recovery and approved reuse.

SAGD drill cuttings

Separate heavy hydrocarbons at the lease or disposal site to reduce long-term residual liability.

Recoverable oils

Separate usable hydrocarbons from sludges, liquid mixtures and complex industrial matrices.

Mill scale

Recover oil and preserve iron-rich solids for approved return to industrial use.

fly ash

Process and condition complex ash streams for approved downstream reuse.

Explore Resource Recovery

Download the Nelson Resource Recovery Brochure [PDF]

More than thermal

One remediation challenge doesn’t always require one technology.

Nelson’s capabilities extend beyond thermal treatment. Nelson In-Situ provides high-resolution site characterization, in-situ remediation and industrial water treatment capabilities for sites and contaminants requiring a different approach.

High-Resolution Site Characterization

In-Situ Remediation

Industrial Water Treatment

Watch the films

Thirty years of treatment, in five minutes.

The Nelson master tradeshow reel: global thermal projects, in-situ remediation, earthworks case studies and the outcomes behind them. Then watch Because tomorrow matters™, the people and projects behind Nelson, before you see us in Banff.

Nelson master tradeshow reel | Five and a half minutes | Sound on

Watch Nelson global remediation film

Because tomorrow matters™ | The people and projects behind Nelson | Four minutes | Sound on

Watch Because tomorrow matters™

Downloadable resources

Explore Nelson before we meet.

Current Nelson documents, free to download. No form required.

PDFNelson capabilities packSell sheet packageDownload PDF

PDFLouis Bull First Nation case study140,000 tonnes treated in AlbertaDownload PDF

PDFTreatment routesContaminant to technology selectionDownload PDF

PDFResource Recovery brochureRecovery streams and mobile systemsDownload PDF

Attending RemTech 2026?

Let’s talk in Banff.

Meet the Nelson team at RemTech 2026 to talk about contaminated soil, mobile thermal treatment, resource recovery or complex remediation challenges.

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson