The subsurface-to-indoor-air migration pathway for volatile contaminants. It is investigated with sub-slab and indoor-air sampling and mitigated primarily by sub-slab depressurization systems that reverse the pressure gradient driving vapor into the building.
Also known as: VI, VIP, sub-slab depressurization, SSDS, PVI, petroleum vapor intrusion.
Vapor intrusion investigation connects a subsurface source, a migration pathway and a building receptor. Start with the site history, contaminant data, building construction and applicable jurisdiction. Sub-slab and indoor-air results must be interpreted together with background sources and sampling conditions. Mitigation controls the exposure pathway; source remediation addresses the contamination generating the vapour. These scopes may be needed together.
Vapor intrusion is the pathway by which volatile contaminants in soil gas or groundwater migrate through the unsaturated zone, cross the building foundation, and enter indoor air. It is a pathway rather than a contaminant. The chemicals of concern are the volatile members of the CVOC and BTEX families (TCE, PCE, cis-1,2-DCE, vinyl chloride, benzene) plus a few emerging players (1,4-dioxane, PCE-daughter vinyl chloride). The engineering interest is the pressure gradient across the slab, because that gradient is what draws vapor through cracks, utility penetrations, and expansion joints into the building.
US EPA's 2015 OSWER Technical Guide provides a framework for assessing and mitigating the vapor intrusion pathway. Screening values, sampling expectations and response requirements vary by jurisdiction and site. Attenuation factors describe the relationship between subsurface and indoor-air concentrations; they are screening assumptions rather than universal proof that mitigation is required or complete.
Petroleum vapor intrusion (PVI) is treated differently. Aerobic biodegradation in the vadose zone attenuates hydrocarbon vapors dramatically over even a few metres of unsaturated soil, which is why EPA's 2015 PVI Guide relaxed the buffer distance to 6 ft above dissolved-phase sources for benzene. The chlorinated-solvent pathway does not benefit from this biodegradation and remains the driver at most VI sites.
Sites overlying CVOC groundwater plumes (dry cleaners, aerospace and defense, printed-circuit-board, degreasing operations). Buildings sitting on former petroleum releases (gas stations, bulk terminals, refinery-adjacent sites). Residential redevelopment of former industrial parcels (New York State's Brownfield program, Massachusetts Chapter 21E sites). Basements above shallow CVOC-impacted groundwater. Schools and daycares near CVOC source areas, the demographic that drives the most stringent risk-management responses.
Vapor intrusion is an exposure pathway. The US examples below provide technical context, not a statement of Nelson office locations or universal service coverage. Confirm the current requirements with the regulator for the actual site; screening values and attenuation assumptions do not replace a site-specific assessment or mitigation design.
| Jurisdiction | Compound | Standard |
|---|---|---|
| US EPA (OSWER 2015 attenuation factors) | Sub-slab to indoor air | 0.03 default AF |
| US EPA (OSWER 2015 attenuation factors) | Groundwater to indoor air | 0.001 default AF |
| US EPA (Vapor Intrusion Screening Level, TCE) | TCE indoor air (residential) | 2.1 μg/m³ |
| New York DOH (indoor air) | TCE (residential) | 2 μg/m³ mitigation, 20 μg/m³ immediate action |
| New Jersey (indoor air screening) | TCE (residential) | 2 μg/m³ |
| MassDEP (imminent hazard, TCE) | TCE (residential) | 6 μg/m³ short-term |
Nelson treats the contaminated soil behind vapor intrusion, using the mobile thermal fleet for excavated soil and in-situ thermal treatment for soil left in place. The building-side methods below are designed and installed by mitigation specialists; they are listed for context so the source and pathway work can be planned together.
A network of suction points beneath the slab, connected to a fan-driven vent stack discharging above the roofline, maintains negative pressure under the slab and reverses the gradient that drives vapor intrusion. Standard mitigation for CVOC and PVI sites. Designed to deliver measurable vacuum (typically ≥6 Pa) at all points beneath the building envelope and verified with post-installation manometer and sub-slab pressure-differential testing.
existing buildings, TCE and PCE mitigation, schools and daycares
Sub-slab depressurization systems (SSDS)
For new construction on a site with known VI risk, a spray-applied or sheet vapor barrier is installed between the sub-base and the slab, coupled to a passive or active venting layer that discharges above the roof. Design integrates with the building envelope and is verified by tracer-gas testing before slab pour.
new construction, redevelopment, brownfield sites
Where mitigation cannot achieve indoor-air targets alone, typically during short-term response actions or with highly permeable slabs, vapor-phase GAC on HVAC return-air ducts provides an interim indoor-air polishing layer. Used with a phased plan that transitions to full SSDS.
interim actions, short-term response, SSDS supplement
Where the driver is a shallow CVOC or petroleum source directly below the building, source removal by in-situ thermal (ERH, TCH) or chemical oxidation eliminates the vapor generator rather than managing the pathway. On redevelopment projects, Nelson can treat the source while a mitigation specialist protects the building.
shallow source-area removal, coordinated remediation
Sub-slab depressurization (SSDS) is a mitigation system that maintains negative pressure in the granular layer beneath a building slab, reversing the pressure gradient that drives vapor intrusion. Suction points connect through PVC piping to a fan-driven vent stack discharging above the roofline. Verified by measuring vacuum (typically ≥6 Pa) at pressure taps beneath the slab. It is the reference standard for existing-building VI mitigation at CVOC and petroleum-vapor sites.
US EPA's 2015 OSWER Technical Guide frames VI as a standard exposure pathway that must be evaluated at any site where volatile chemicals are present in soil, soil gas, or groundwater and where buildings sit within the vapor migration distance. State agencies apply screening triggers tied to attenuation factors, typically 0.03 sub-slab to indoor air and 0.001 groundwater to indoor air. New York and New Jersey have the most detailed decision matrices, and TCE has the strictest indoor-air action levels because of its short-term developmental effects.
Yes. Petroleum hydrocarbons biodegrade aerobically in the vadose zone, so vapors from dissolved-phase gasoline and diesel sources attenuate significantly over even a few metres of unsaturated soil above the water table. US EPA's 2015 PVI Guide allows a 6-ft buffer above dissolved-phase sources for benzene. Chlorinated solvents (TCE, PCE, vinyl chloride) do not benefit from this biodegradation and remain the driver at most VI sites. Free-phase petroleum (LNAPL) is a different case and does not qualify for the PVI attenuation credit.
For as long as the underlying source drives vapor above indoor-air action levels, commonly decades. SSDS systems are typically operated as long-term institutional controls under an Operations, Maintenance, and Monitoring plan, with quarterly manometer checks and periodic indoor-air verification sampling. When source-area remediation eliminates the vapor generator (thermal removal, ISCO), SSDS operation can be reduced or terminated with regulator concurrence.
Send the building, the contaminant, and what the indoor-air data shows. Nelson comes back with the source-treatment route that fits the site: on-site thermal treatment of excavated soil or in-situ thermal treatment of soil left in place.