PFAS Regulatory Tracker

AL

State Regulatory Brief

EPA Region 4

Alabama PFAS Regulations: Federal Limits, ADEM Practice and What Sites Actually Face

Federal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

Alabama has no PFAS number of its own. It runs the 2024 federal drinking water rule through ADEM, which means the compliance question is settled and the harder question is what happens to the manufacturing and firefighting foam legacy along the Tennessee River.

Agency

Alabama Department of Environmental Management (ADEM), Drinking Water Branch

Primary Statute

Alabama Environmental Management Act; ADEM Admin. Code r. 335-7 adopting 40 CFR 141 Subpart Z

Rule Adopted

Federal rule effective 25 June 2024

Compliance

2029-04-26

Context

Regulatory Overview

Alabama implements the federal PFAS drinking water rule and has not written a separate state MCL. For a public water system that makes the compliance picture simple to describe. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029.

The site side is where Alabama is distinctive. North Alabama carries one of the longest fluorochemical manufacturing histories in the country around Decatur, and the Tennessee River corridor has been the subject of drinking water litigation, utility treatment build-outs and biosolids questions for more than a decade. That history means Alabama systems and industrial dischargers were dealing with PFAS well before the federal rule arrived.

The absence of a state numeric standard does not remove liability. PFOA and PFOS became CERCLA hazardous substances in 2024, which pulls federal cost recovery into any property transaction or industrial closure where those compounds are present. ADEM's remediation programmes and the federal designation, working together, are what actually drive cleanup in Alabama.

Numbers

State MCL vs Federal MCL

Compound

Alabama

Federal (2024 NPDWR)

Note

PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029

PFOSNo state MCL4 pptFederal MCL controls

PFHxSNo state MCL10 ppt

PFNANo state MCL10 ppt

HFPO-DA (GenX)No state MCL10 ppt

MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.

2016-06West Morgan-East Lawrence Water Authority advises customers not to drink the water after PFOA and PFOS results exceed the federal health advisory, one of the first such notices in the country.

2019-2023Utility and authority litigation over Tennessee River PFAS discharges results in settlements funding treatment at affected north Alabama water systems.

2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.

2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.

2023-08Decatur area PFAS sampling and site work expands to include land application and biosolids questions alongside direct discharge.

2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.

2024-06ADEM implements the federal MCL for Alabama public water systems.

2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.

2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.

Case Docket

Notable Enforcement & Response Cases

2016 onward

West Morgan-East Lawrence Water Authority

The authority's do-not-drink notice and subsequent litigation over PFAS in the Tennessee River became the template for utility recovery actions in the south. The result was a treatment build-out funded through settlement rather than through rates.

ongoing

Decatur area manufacturing and biosolids

Fluorochemical manufacturing in the Decatur area has driven sampling of soils, sludges and land-applied biosolids in surrounding counties. Land application history is the awkward part, because it spreads a legacy problem across properties that never handled the chemical.

ongoing

Military and airport fire training areas

Anniston Army Depot, Fort Novosel and Alabama Air National Guard sites carry the usual fire training area profile. That work runs on the federal Defense Environmental Restoration Program schedule with ADEM in a review role.

Compliance

Permit & Cleanup Pathways

Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.

Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.

Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.

On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.

ADEM issues NPDES permits, and PFAS monitoring conditions are appearing in permits for industrial dischargers along the Tennessee River corridor.

Land application of biosolids in Alabama should be screened for PFAS before the material moves, because the receiving property inherits the record.

Obligations

Sampling & Reporting

Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.

Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.

Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.

Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.

Systems drawing from the Tennessee River below historic discharge points should sample raw and finished water separately, since conventional treatment does not remove PFAS and the finished number alone hides what the source is doing.

FAQ

Frequently Asked Questions

Does Alabama have its own PFAS drinking water limit?
No. Alabama applies the federal MCLs adopted in 2024, implemented through ADEM. Those are 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture.
When do Alabama water systems have to comply?
Initial monitoring results are due by 2027 and compliance with the MCLs by 26 April 2029. Systems that discover an exceedance late in that window rarely have enough time left to design, fund and build treatment.
Can PFAS-impacted soil be landfilled in Alabama?
There is no PFAS-specific waste listing in Alabama, so acceptance depends on the individual landfill's criteria and on whether the material triggers hazardous waste characteristics for other reasons. Acceptance policies have tightened, which is why on site destruction is now the more predictable route on larger volumes.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

ADEM Drinking Water Program

US EPA, PFAS National Primary Drinking Water Regulation (2024)

US EPA, PFOA and PFOS designated CERCLA hazardous substances (2024)

US EPA, Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) results

Other State Briefs

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

CTConnecticutSix-compound 10 ng/L drinking-water action level; PFAS Roadmap product phase-outs; Bradley IAP AFFF spill precedent.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson