PFAS Regulatory Tracker

AZ

State Regulatory Brief

EPA Region 9

Arizona PFAS Regulations: Federal Limits, ADEQ Sampling and the Tucson Plume Problem

Federal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

Arizona applies the federal drinking water rule and has done more voluntary sampling than most states that lack their own number. The result is an unusually clear map of where the problem is, and Tucson sits at the centre of it.

Agency

Arizona Department of Environmental Quality (ADEQ), Water Quality Division

Primary Statute

A.A.C. Title 18, Chapter 4 (safe drinking water); Aquifer Protection Permit programme under A.R.S. Title 49

Rule Adopted

Federal rule effective 25 June 2024

Compliance

2029-04-26

Context

Regulatory Overview

Arizona has adopted the federal PFAS MCLs rather than writing its own. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029. ADEQ implements the rule for public water systems and has run a statewide PFAS sampling programme that reached well beyond the systems federal monitoring would have covered.

Groundwater is the pressure point. Much of Arizona's supply is pumped, so a PFAS plume moves through the resource that communities depend on rather than past it in a river. Tucson has the longest history here, with airport-area and Air National Guard sources feeding a plume that has already forced treatment plant modifications and well shutdowns. Luke Air Force Base and other installations in the Phoenix area carry the same fire training profile.

Arizona's Aquifer Protection Permit programme is the state instrument that matters most for site work. It governs discharges that reach groundwater and gives ADEQ a lever over remediation systems, injection and treatment residuals in a way that a state with abundant surface water would handle through a discharge permit instead.

Numbers

State MCL vs Federal MCL

Compound

Arizona

Federal (2024 NPDWR)

Note

PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029

PFOSNo state MCL4 pptFederal MCL controls

PFHxSNo state MCL10 ppt

PFNANo state MCL10 ppt

HFPO-DA (GenX)No state MCL10 ppt

MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined

Aquifer protectionAPP programme, A.R.S. Title 49No equivalentState permit controls discharges that reach groundwater

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.

2018-2021PFAS detections near Tucson International Airport and the Morris Air National Guard Base lead to well shutdowns and treatment plant changes.

2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.

2021-2023ADEQ runs statewide PFAS sampling of public water systems, giving Arizona a fuller detection map than the federal monitoring alone would have produced.

2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.

2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.

2024-06Federal MCL takes effect; ADEQ folds it into its drinking water compliance programme.

2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.

2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.

Case Docket

Notable Enforcement & Response Cases

long running

Tucson airport area groundwater

PFAS in the Tucson airport area sits on top of a decades-old solvent plume, which means a treatment system built for one contaminant had to be reassessed for another. Tucson Water has taken supply offline and reworked treatment in response.

ongoing

Luke Air Force Base and Phoenix-area installations

Fire training areas at Arizona installations are in the federal investigation and cleanup programme, with off-base sampling of nearby wells as part of the standard sequence.

2021 onward

Statewide ADEQ sampling programme

Voluntary sampling by ADEQ identified detections at systems that had no federal monitoring duty. It gave the state a head start on where the 2029 compliance problems will be.

Compliance

Permit & Cleanup Pathways

Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.

Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.

Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.

On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.

Aquifer Protection Permits govern any discharge that reaches groundwater, including remediation system discharge, reinjection and infiltration of treated water.

Water reuse and recharge projects in Arizona should confirm the PFAS status of the source water, because recharge puts the question directly into the aquifer that supplies the community.

Obligations

Sampling & Reporting

Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.

Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.

Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.

Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.

Where a plume overlaps a legacy solvent site, sample for both. A remediation system designed for volatile organics does not remove PFAS, and running it can move the plume without reducing the PFAS mass.

FAQ

Frequently Asked Questions

Does Arizona have a state PFAS standard?
No. Arizona applies the federal MCLs. What Arizona adds is an active state sampling programme and the Aquifer Protection Permit framework, which controls what can be discharged to groundwater.
Why does Tucson keep coming up in Arizona PFAS coverage?
Because the airport area has both a long-standing solvent plume and PFAS from fire training, in an aquifer that supplies a large city. It is the clearest example in the state of PFAS layered onto an existing remediation project.
Does an Aquifer Protection Permit apply to a PFAS treatment system?
It can. If the system discharges to the ground or reinjects treated water, ADEQ's aquifer protection programme is the permitting route, and the application should address PFAS specifically rather than relying on a general discharge characterisation.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

ADEQ PFAS Program

Arizona Aquifer Protection Permit programme

US EPA, PFAS National Primary Drinking Water Regulation (2024)

US Department of Defense, PFAS cleanup and AFFF transition reporting

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

CTConnecticutSix-compound 10 ng/L drinking-water action level; PFAS Roadmap product phase-outs; Bradley IAP AFFF spill precedent.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner