PFAS Regulatory Tracker

CT

State Regulatory Brief

EPA Region 1

Connecticut PFAS Regulations: The Action Level Framework & PFAS Roadmap

Six-compound 10 ng/L drinking-water action level; PFAS Roadmap product phase-outs; Bradley IAP AFFF spill precedent.

Connecticut layers a state action-level regime, a formal PFAS Roadmap product phase-out, and one of the country's most visible AFFF spill responses (Bradley IAP, 2019) into a single coordinated PFAS program under DEEP and DPH.

Agency

CT Department of Energy and Environmental Protection (DEEP); Department of Public Health (DPH)

Primary Statute

CGS §22a-133k (RSRs); Circular Letter EHDW #2023-23 (drinking water action level); PA 21-191 (product restrictions)

Rule Adopted

Action Level of 10 ng/L for sum of six PFAS issued May 31, 2023 (Circular Letter EHDW #2023-23); PFAS Roadmap 2019; PA 21-191 signed 2021

Compliance

Action level in force; product restrictions phased 2023 → 2028; federal MCL 2029 (EPA proposed changes on 18 May 2026 that are not final)

Context

Regulatory Overview

Connecticut DPH enforces a drinking-water action level of 10 ng/L for the sum of six PFAS compounds (PFOA, PFOS, PFHxS, PFNA, PFHpA, PFDA), set by Circular Letter EHDW #2023-23 on May 31, 2023. It is advisory guidance rather than an enforceable MCL, but exceedance triggers public notification and treatment or source replacement under DPH oversight. It replaced the 2019 action level of 70 ppt for the sum of five PFAS.

The Connecticut PFAS Action Plan and Roadmap (2019) is the operative interagency framework for source reduction, product restriction, response, and site cleanup. PA 21-191 codified AFFF restrictions and food-packaging bans on the Roadmap schedule.

The June 2019 Bradley International Airport AFFF hangar release, approximately 40,000 gallons of AFFF into the Farmington River watershed, remains the country's largest single AFFF release event. Response set precedent for CT DEEP spill oversight, aviation-sector AFFF conversion, and downstream water utility monitoring.

Numbers

State MCL vs Federal MCL

Compound

Connecticut

Federal (2024 NPDWR)

Note

PFOA10 (sum)4 ppt

PFOS10 (sum)4 ppt

PFHxS10 (sum)10 ppt

PFNA10 (sum)10 ppt

PFHpA10 (sum)Not regulated

PFDA10 (sum)Not regulated

Sum-of-610 pptHI (subset)

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2019-06Bradley IAP AFFF hangar release into Farmington River.

2019-11PFAS Action Plan and Roadmap published; five-compound 70 ppt action level adopted (superseded 2023).

2021-06PA 21-191 signed, AFFF and food-packaging restrictions on Roadmap schedule.

2023-05CT DPH issues Circular Letter EHDW #2023-23, replacing the 2019 action level with a 10 ng/L sum-of-six PFAS action level.

2023-2024Roadmap product bans phased in; AFFF take-back and destruction pilots operative.

2024-06Federal NPDWR effective; Roadmap and action level layered.

Case Docket

Notable Enforcement & Response Cases

2019 to date

Bradley International Airport, Signature Flight Support AFFF Release

Accidental discharge of ~40,000 gallons of AFFF-water mixture into the storm system and Farmington River drove one of the largest state PFAS spill responses in the US. DEEP compelled recovery, soil excavation, drinking water sampling of downstream utilities, and long-term monitoring; contributed to Connecticut's PFAS Roadmap acceleration.

Public source

2020 to date

US Coast Guard Academy / Groton, AFFF investigation

PFAS characterization at USCG facilities with DEEP oversight; remediation ongoing under DoD/DHS PFAS response programs.

2021 to date

Legacy manufacturing sites, Naugatuck Valley industrial corridor

Multiple RSR-driven investigations of former plating and specialty chemical operations under Connecticut's Transfer Act and Voluntary Remediation programs.

Compliance

Permit & Cleanup Pathways

Remediation Standard Regulations (RSRs) under CGS §22a-133k, PFAS is a listed substance with numeric criteria under development.

Transfer Act (CGS §22a-134) triggers on property transfer of established sites with PFAS suspicion.

DEEP Waste Engineering and Enforcement approval for PFAS-impacted media disposition.

DEEP air permits for thermal destruction; parallel notification for on-site treatment residuals.

Obligations

Sampling & Reporting

PWS federal MCL monitoring 2025 to 2027 + state action-level monitoring.

Transfer Act Phase I / II / III site assessments increasingly include PFAS scope.

DEEP spill response reporting for any AFFF discharge or PFAS release above state reportable quantities.

FAQ

Frequently Asked Questions

Is Connecticut's action level enforceable?
The 10 ng/L sum-of-six action level, set by Circular Letter EHDW #2023-23 in May 2023, is enforced through DPH's public notification and treatment expectations for public water systems and is treated as an effective compliance target, even though it is advisory guidance and not a codified MCL. It replaced the 2019 five-compound 70 ppt level.
What is the significance of the Bradley IAP release?
It remains one of the largest documented AFFF releases in US history and accelerated Connecticut's Roadmap enactment, industry-wide airport AFFF conversion planning, and DEEP's PFAS spill response protocols.
How is PFAS handled under Connecticut's Transfer Act?
PFAS is increasingly scoped into Phase I environmental site assessments for Transfer Act properties. When PFAS is confirmed, RSR-based remediation and long-term stewardship obligations attach on transfer.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

CT DEEP PFAS Program

CT DPH Drinking Water PFAS

CT PFAS Action Plan

US EPA PFAS NPDWR

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • PFAS and the changing landscape: What site owners should know
  • LNAPL remediation regulations: How to identify the requirements for your site
  • Alberta Tier 1 soil and groundwater remediation guidelines: How to assess their applicability
  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson