GA
State Regulatory Brief
EPA Region 4
Federal MCL through Georgia EPD; the carpet corridor, land-applied sludge and downstream utility recovery actions carry the weight.
Georgia runs on the federal drinking water rule. The state's PFAS story is written in the carpet corridor around Dalton, where manufacturing, wastewater and land application put PFAS into a river system that supplies downstream cities.
Agency
Georgia Environmental Protection Division (EPD), Watershed Protection Branch
Primary Statute
Georgia Safe Drinking Water Act, O.C.G.A. §12-5-170 et seq.; 40 CFR 141 Subpart Z
Rule Adopted
Federal rule effective 25 June 2024
Compliance
2029-04-26
Context
Georgia EPD implements the federal PFAS drinking water rule and has not adopted a state MCL. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029.
The distinctive Georgia problem is upstream of the tap. Carpet and textile manufacturing around Dalton used PFAS in stain and water repellent treatments for decades. Wastewater from those operations went to municipal treatment plants that were never designed to remove PFAS, and the resulting sludge was land applied across surrounding farmland. Both routes put PFAS into the Conasauga and Coosa river systems that supply downstream communities.
That is why Georgia has produced significant utility litigation rather than significant state rulemaking. Downstream water providers have pursued manufacturers and suppliers to fund treatment. For a site owner, the important consequence is that land application history is now a diligence item on rural Georgia property, and a farm that never handled a chemical can hold the record of it.
Numbers
Compound
Georgia
Federal (2024 NPDWR)
Note
PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029
PFOSNo state MCL4 pptFederal MCL controls
PFHxSNo state MCL10 ppt
PFNANo state MCL10 ppt
HFPO-DA (GenX)No state MCL10 ppt
MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined
Biosolids and land applicationNo PFAS-specific numeric limitNo federal limitHistoric land application is a diligence issue in north Georgia
ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.
History
2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.
2016-2019Downstream utilities on the Coosa and Conasauga systems identify PFAS attributable to carpet-sector discharges and begin recovery actions.
2019-2023Dalton area wastewater treatment, sludge management and land application practices come under sustained scrutiny.
2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.
2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.
2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.
2024-06Federal MCL takes effect in Georgia through EPD's drinking water programme.
2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.
2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.
Case Docket
2016 onward
Water providers downstream of Dalton pursued carpet manufacturers and chemical suppliers over PFAS in their source water. The pattern established that a utility does not need a state MCL to recover treatment costs.
ongoing
Sludge from treatment plants receiving carpet-sector wastewater was spread on farmland. The result is diffuse PFAS across properties with no industrial history of their own, which is the hardest kind of site to scope.
ongoing
Robins Air Force Base, Moody Air Force Base and Fort Benning carry the standard fire training profile, investigated through the federal restoration programme with EPD review.
Compliance
Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.
Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.
Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.
On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.
EPD industrial pretreatment programmes are the practical control point for PFAS reaching a municipal plant, because the plant cannot remove what it receives.
Land application permits should be screened for PFAS before material moves, since the receiving field inherits the obligation and the record.
Obligations
Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.
Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.
Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.
Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.
Utilities on the Conasauga and Coosa systems should sample raw water and treat the finished water number as a treatment performance question rather than a source characterisation.
Sludge and biosolids sampling is not a federal duty, and it is the fastest way to find out whether a treatment plant is producing a future liability.
FAQ
Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.
Georgia EPD, Watershed Protection Branch
US EPA, PFAS National Primary Drinking Water Regulation (2024)
US EPA, PFOA and PFOS designated CERCLA hazardous substances (2024)
US EPA, Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) results
See all 51 US jurisdictions in the PFAS Regulatory Tracker →
Contact
Project inquiries, technical consultation, or emergencies.
We respond to project inquiries within one business day.
Nelson Environmental Remediation
Head Office
30541 - 100 Avenue
Acheson (Edmonton), Alberta
Canada T7X 6L8
Phone
Toll Free: 1.888.960.8222
Fax
1.780.962.6885