PFAS Regulatory Tracker

ID

State Regulatory Brief

EPA Region 10

Idaho PFAS Regulations: Federal Limits over a Vulnerable Aquifer

Federal MCL through Idaho DEQ; Mountain Home Air Force Base and fast-moving aquifer systems set the risk profile.

Idaho applies the federal drinking water rule with no state number of its own. What makes Idaho worth reading carefully is hydrogeology: much of the state drinks from aquifers that move water quickly, which shortens the distance between a spill and a supply well.

Agency

Idaho Department of Environmental Quality (DEQ), Drinking Water Program

Primary Statute

IDAPA 58.01.08 (Idaho Rules for Public Drinking Water Systems) incorporating 40 CFR 141

Rule Adopted

Federal rule effective 25 June 2024

Compliance

2029-04-26

Context

Regulatory Overview

Idaho DEQ implements the federal PFAS rule through the state drinking water rules. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029. There is no Idaho MCL, notification level or PFAS soil standard.

The Eastern Snake River Plain Aquifer and the Treasure Valley system supply most of the state's population, and both transmit water quickly. A release that would spread slowly elsewhere can reach production wells here in a way that compresses the time available to respond. That argues for treating source material rather than monitoring a plume and hoping the travel time holds.

Mountain Home Air Force Base is the state's most-cited PFAS site, with the fire training profile common to every Air Force installation. Regional airports, fire service training grounds and industrial coating operations make up the rest of the picture. Idaho's agricultural water use also means that irrigation and land application can move PFAS in ways a purely urban assessment would miss.

Numbers

State MCL vs Federal MCL

Compound

Idaho

Federal (2024 NPDWR)

Note

PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029

PFOSNo state MCL4 pptFederal MCL controls

PFHxSNo state MCL10 ppt

PFNANo state MCL10 ppt

HFPO-DA (GenX)No state MCL10 ppt

MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.

2019-2023Mountain Home Air Force Base PFAS investigation proceeds through the federal restoration programme, including off-base sampling.

2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.

2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.

2023-2025UCMR 5 results give Idaho its first broad public dataset on PFAS occurrence in public supplies.

2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.

2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.

2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.

Case Docket

Notable Enforcement & Response Cases

ongoing

Mountain Home Air Force Base

Fire training areas and hangar release points are under investigation with off-base groundwater sampling. The base sits over an aquifer system used for both drinking water and irrigation, which raises the consequence of any migration.

ongoing

Regional airports and fire service training grounds

Foam was used for training and equipment testing at municipal airports across Idaho. These sites are usually identified through inventory work rather than through complaints, because the affected water is often a private well.

2023-2025

UCMR 5 occurrence data

Federal monitoring gave Idaho systems their first consistent look at PFAS occurrence. For several systems the useful finding was a clean result that supports a reduced monitoring schedule.

Compliance

Permit & Cleanup Pathways

Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.

Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.

Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.

On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.

Idaho DEQ's site remediation and voluntary cleanup routes are the pathway to a closure document, since no PFAS-specific cleanup standard exists.

Wastewater land application and reuse permits should address PFAS where the source water or the industrial contributor has any foam or coating history.

Obligations

Sampling & Reporting

Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.

Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.

Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.

Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.

In fast aquifer settings, quarterly sampling can miss a moving front. Where a known source is upgradient, sampling frequency should follow the hydrogeology rather than the minimum compliance schedule.

FAQ

Frequently Asked Questions

Does Idaho regulate PFAS in soil?
There is no Idaho PFAS soil standard. Cleanup obligations arise through the state's remediation programmes and, for PFOA and PFOS, through CERCLA following the 2024 federal designation.
What should an Idaho system do if UCMR 5 showed detections below the MCL?
Keep sampling and watch the trend. A detection below 4 ppt is not a violation, and it is also not a stable condition when there is an identified upgradient source.
Is irrigation water covered by the PFAS rule?
No. The federal MCL applies to public drinking water systems. Irrigation and reuse are handled through state water quality programmes, which is why land application history matters separately from drinking water compliance.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

Idaho DEQ Drinking Water Program

US EPA, PFAS National Primary Drinking Water Regulation (2024)

US Department of Defense, PFAS cleanup and AFFF transition reporting

US EPA, Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) results

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner