Iowa PFAS Regulations: Federal Limits and the DNR Sampling Programme

Federal MCL with a DNR Action Plan and voluntary sampling programme that reached beyond the federally monitored systems.

Iowa applies the federal drinking water rule and has run its own sampling programme under a PFAS Action Plan since 2021. The state chose to find out where the problem was before the federal deadline forced the question.

Agency

Iowa Department of Natural Resources (DNR), Water Supply Engineering

Primary Statute

Iowa Admin. Code 567 Ch. 41 incorporating 40 CFR 141 Subpart Z

Rule Adopted

Federal rule effective 25 June 2024

Compliance

2029-04-26

Context

Regulatory Overview

Iowa has no state PFAS MCL and implements the federal rule through DNR. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029.

The DNR PFAS Action Plan set out a staged sampling programme targeting systems near likely sources, which included airports, military installations, landfills and industrial properties. Iowa published the results as they came in, which gave utilities time to plan and gave the public a clear picture rather than a rumour.

Iowa's agricultural profile adds a second question that drinking water rules do not answer. Biosolids and manure management, land application and shallow alluvial wells are all pathways that put PFAS into rural supplies. A private well near a land-applied field is outside the public water system rules entirely, which is where the state's voluntary programmes carry the load.

Numbers

State MCL vs Federal MCL

Compound

Iowa

Federal (2024 NPDWR)

Note

PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029

PFOSNo state MCL4 pptFederal MCL controls

PFHxSNo state MCL10 ppt

PFNANo state MCL10 ppt

HFPO-DA (GenX)No state MCL10 ppt

MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined

Private wellsOutside PWS rulesOutside PWS rulesCovered through DNR and county programmes rather than compliance duties

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.

2021-05Iowa DNR publishes its PFAS Action Plan and begins targeted sampling of public water supplies near likely sources.

2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.

2022-2024Sampling results are released progressively, identifying a small number of systems with results above the later federal MCLs.

2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.

2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.

2024-06Federal MCL becomes the Iowa compliance standard.

2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.

2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.

Case Docket

Notable Enforcement & Response Cases

2021 onward

DNR PFAS Action Plan sampling

A staged, source-targeted sampling programme rather than a blanket sweep. It located the affected systems early and let those utilities start planning treatment while the federal rule was still being written.

ongoing

Airport and Air National Guard fire training areas

Des Moines and Sioux City Air National Guard sites and municipal airports across Iowa carry the standard foam history, with investigation through the federal programme where a military source is involved.

ongoing

Landfill leachate

Leachate is a recognised PFAS pathway in Iowa because it concentrates decades of consumer and industrial waste and is then sent to a treatment plant that cannot remove it.

Compliance

Permit & Cleanup Pathways

Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.

Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.

Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.

On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.

Landfill leachate discharge arrangements should be reviewed for PFAS, because the receiving treatment plant becomes the discharger of record.

Land application programmes for biosolids and industrial residuals are the rural pathway that most often surprises a buyer years later.

Obligations

Sampling & Reporting

Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.

Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.

Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.

Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.

Alluvial wells along Iowa's river systems respond quickly to surface conditions, so a single low result in a dry period is weak evidence about the rest of the year.

FAQ

Frequently Asked Questions

Did Iowa find widespread PFAS in drinking water?
The DNR sampling programme found detections at a modest number of systems and exceedances of the later federal MCLs at fewer still. The value of the programme was locating them early rather than the headline count.
Are private wells covered?
Not by the federal rule. Private wells fall outside public water system requirements, so testing runs through DNR and county programmes or through the responsible party at a known site.
What is the biggest PFAS blind spot in Iowa?
Land application and landfill leachate. Both spread material that carries PFAS into settings with no industrial history, and neither is governed by a drinking water number.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

Iowa DNR PFAS information

US EPA, PFAS National Primary Drinking Water Regulation (2024)

US EPA, PFOA and PFOS designated CERCLA hazardous substances (2024)

US EPA, Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) results

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson