Mississippi PFAS Regulations: Federal Limits and a Small System Challenge

Federal MCL through the Department of Health; military fire training areas and small system capacity define the workload.

Mississippi applies the federal drinking water rule with no state overlay. The state's real PFAS challenge is capacity: a large number of very small systems now face a treatment standard designed with larger utilities in mind.

Agency

Mississippi State Department of Health (drinking water) and Mississippi Department of Environmental Quality (MDEQ)

Primary Statute

Mississippi Safe Drinking Water Act; state regulations incorporating 40 CFR 141 Subpart Z

Rule Adopted

Federal rule effective 25 June 2024

Compliance

2029-04-26

Context

Regulatory Overview

Mississippi has no state PFAS MCL and applies the federal rule. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029.

Mississippi has hundreds of community water systems, and many serve small rural populations with limited engineering staff and limited access to capital. For those systems the technical answer to a PFAS exceedance is well understood and the financial answer is not. State revolving fund and federal emerging contaminant money is the practical route, and it takes long enough that a system discovering a problem in 2028 will struggle.

The site inventory is dominated by military and aviation properties. Columbus Air Force Base, Keesler Air Force Base, Naval Construction Battalion Center Gulfport and Air National Guard installations all carry foam histories, and coastal conditions at the Gulfport and Biloxi sites make groundwater shallow and quick to respond.

Numbers

State MCL vs Federal MCL

Compound

Mississippi

Federal (2024 NPDWR)

Note

PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029

PFOSNo state MCL4 pptFederal MCL controls

PFHxSNo state MCL10 ppt

PFNANo state MCL10 ppt

HFPO-DA (GenX)No state MCL10 ppt

MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.

2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.

2021-2024Military installation PFAS investigations progress at Columbus, Keesler and Gulfport through the federal restoration programme.

2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.

2023-2025UCMR 5 monitoring gives Mississippi its first broad occurrence dataset.

2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.

2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.

2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.

Case Docket

Notable Enforcement & Response Cases

ongoing

Keesler Air Force Base and Gulfport

Coastal installations with shallow groundwater and nearby residential areas. Shallow conditions mean short travel times, so off-base sampling is a standard part of the sequence rather than a contingency.

ongoing

Columbus Air Force Base

A pilot training installation with a long fire training history, in the federal investigation programme with state review.

ongoing

Small system capacity

Mississippi's fragmented water system landscape means consolidation is frequently the cheaper compliance route than treatment at each small plant.

Compliance

Permit & Cleanup Pathways

Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.

Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.

Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.

On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.

MDEQ's remediation and brownfield programmes are the route to closure documents, with no PFAS-specific cleanup value.

Consolidation and interconnection are compliance strategies in their own right for small Mississippi systems, and both need lead time.

Obligations

Sampling & Reporting

Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.

Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.

Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.

Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.

Shallow coastal aquifers respond to rainfall and tide. Sampling programmes near the coast should account for that variability rather than treating a single quarter as definitive.

FAQ

Frequently Asked Questions

Does Mississippi have its own PFAS rule?
No. The federal MCLs apply, implemented through the Mississippi State Department of Health.
What is the biggest compliance risk in Mississippi?
Small systems finding an exceedance too late to fund and build treatment before 26 April 2029. Early sampling is the only remedy for that.
Is consolidation a legitimate compliance path?
Yes. Interconnecting with a larger system or consolidating small systems is often cheaper than installing and staffing treatment at each one, and it removes the ongoing operating burden.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

Mississippi State Department of Health, Public Water Supply

MDEQ

US EPA, PFAS National Primary Drinking Water Regulation (2024)

US Department of Defense, PFAS cleanup and AFFF transition reporting

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record
  • Petroleum-contaminated soil treatment in the US: build the plan around the fuel profile
  • Contaminated soil management in the US: from excavation to an accepted destination
  • US remediation project evidence: what Tioga and Honolulu tell a project owner

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson