TN
State Regulatory Brief
EPA Region 4
Federal MCL through TDEC, with sampling completed ahead of the deadline and site work concentrated at manufacturing and military properties.
Tennessee applies the federal drinking water rule and has sampled its public systems through TDEC. The site work follows the state's chemical manufacturing and military geography rather than a state number.
Agency
Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
Primary Statute
Tenn. Comp. R. & Regs. 0400-45-01 incorporating 40 CFR 141 Subpart Z
Rule Adopted
Federal rule effective 25 June 2024
Compliance
2029-04-26
Context
TDEC implements the federal PFAS drinking water rule. Tennessee has not adopted a state MCL. The federal MCLs of 4 ppt for PFOA and PFOS, 10 ppt each for PFHxS, PFNA and HFPO-DA, and a hazard index of 1 for the mixture took effect on 25 June 2024. Initial monitoring is due by 2027 and compliance by 26 April 2029.
TDEC sampled public water systems ahead of the federal requirement, prioritising systems near likely sources. Results showed most systems below the later federal MCLs, with the exceptions concentrated near chemical manufacturing, aviation and military properties rather than distributed across the state.
Tennessee's chemical sector, particularly along the Tennessee River and in the east of the state, includes operations with fluorochemical and coating history. Arnold Air Force Base, Naval Support Activity Mid-South and Air National Guard sites carry the foam profile. Biosolids land application adds a rural pathway that no drinking water rule addresses.
Numbers
Compound
Tennessee
Federal (2024 NPDWR)
Note
PFOANo state MCL4 pptFederal MCL controls, compliance 26 April 2029
PFOSNo state MCL4 pptFederal MCL controls
PFHxSNo state MCL10 ppt
PFNANo state MCL10 ppt
HFPO-DA (GenX)No state MCL10 ppt
MixtureNo state valueHI ≤ 1PFHxS, PFNA, HFPO-DA and PFBS combined
BiosolidsNo PFAS numeric limitNo federal limitLand application history is a diligence item on rural property
ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.
History
2016-05EPA issues the 70 ppt lifetime health advisory for PFOA and PFOS combined, the first national number utilities worked to.
2021-10EPA publishes the PFAS Strategic Roadmap, committing to a drinking water rule, CERCLA designation and effluent guidelines.
2021-2023TDEC samples public water systems for PFAS ahead of federal monitoring, prioritising systems near likely sources.
2022-2024Site investigations expand at manufacturing and military properties identified through inventory work.
2023-01UCMR 5 monitoring begins, putting 29 PFAS analytes into routine sampling at large and selected small systems.
2024-04-10EPA finalises the PFAS National Primary Drinking Water Regulation, 89 FR 32532.
2024-06-25The federal rule takes effect in this state, with initial monitoring due by 2027 and compliance by 26 April 2029.
2026-05-18EPA proposes changes to parts of the 2024 rule. Those changes are not final, and the 2024 values remain the ones to plan against.
Case Docket
2021-2023
A targeted programme that located the affected systems before the federal deadline, giving those utilities a planning runway rather than an emergency.
ongoing
Fluorochemical and coating operations along the Tennessee River are the state's most significant industrial sources, with discharge and pretreatment conditions as the control point.
ongoing
Arnold Air Force Base, Mid-South and Air National Guard sites are in the federal investigation programme, with TDEC in a review role for state-regulated media.
Compliance
Site liability runs through the state voluntary cleanup or remediation programme and, where PFOA or PFOS are present, through CERCLA following the 2024 hazardous substance designation.
Federal facilities work under CERCLA and the Defense Environmental Restoration Program, so the schedule and the funding follow the military service rather than the state permit calendar.
Spent granular activated carbon, ion exchange resin and impacted soil move under the state solid and hazardous waste rules. No PFAS-specific waste listing applies, which makes the disposal facility's own acceptance criteria the practical constraint.
On site thermal treatment needs a state air authorisation. Applications carry better when they include stack testing evidence and destruction data from comparable PFAS work.
TDEC's Voluntary Oversight and Assistance Program is the practical route to a closure letter, with PFAS handled on a risk basis.
Biosolids land application permits should be screened for PFAS before material moves.
Obligations
Initial monitoring for all 6 regulated PFAS is due by 2027, quarterly for surface water systems and for groundwater systems serving more than 10,000 people, with reduced schedules available once results are consistently low.
Compliance is measured on a running annual average at each entry point to the distribution system, so a single quarter above the MCL can be carried by later clean quarters and a single clean quarter cannot rescue a bad year.
Public notice and reporting in the Consumer Confidence Report start once a system is in violation, and utilities that wait until 2029 to find out lose the years they would need to design and build treatment.
Laboratories must run EPA Method 533 or 537.1 for compliance samples. Site investigation work commonly uses Method 1633 for the wider analyte list in soil, sludge and wastewater.
Karst terrain in parts of Tennessee moves water fast and unpredictably. Where karst is present, conventional monitoring well spacing can miss the pathway entirely.
FAQ
Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.
US EPA, PFAS National Primary Drinking Water Regulation (2024)
US EPA, PFOA and PFOS designated CERCLA hazardous substances (2024)
US EPA, Fifth Unregulated Contaminant Monitoring Rule (UCMR 5) results
See all 51 US jurisdictions in the PFAS Regulatory Tracker →
Contact
Project inquiries, technical consultation, or emergencies.
We respond to project inquiries within one business day.
Nelson Environmental Remediation
Head Office
30541 - 100 Avenue
Acheson (Edmonton), Alberta
Canada T7X 6L8
Phone
Toll Free: 1.888.960.8222
Fax
1.780.962.6885