dioxins · Global / Defence Legacy
Dioxins, PCBs, and the broader Stockholm Convention list of unintentional and intentional persistent organic pollutants present one of the highest-stakes destruction challenges in environmental remediation. Stockholm Convention parties, most of the world, carry destruction obligations[1], and UNEP BAT/BEP guidelines[2] set the international benchmark for thermal destruction performance.
Defence-legacy sites carry an outsized share of the global POPs inventory: former installations, fire-training grounds, ordnance disposal sites, and storage depots. Civilian-legacy sites add pulp/paper, smelter, chlor-alkali, and incinerator inventories. The technical bar is the same: cleave the chlorinated aromatic structure, prevent reformation across the de-novo synthesis window, and document the destruction to international standards.
Dioxins and furans are among the most persistent, most bioaccumulative, and most tightly regulated contaminants on any site inventory. Landfilling and stabilization do not break the aromatic chlorinated structure. They defer the liability into perpetuity.
Nelson operates RS-series high-temperature thermal desorption equipment engineered to drive dioxin-impacted soil to the temperatures and residence times required to destroy the parent compounds, with off-gas routed through a secondary high-temperature oxidizer and engineered acid-gas treatment train. The result is a verified clean soil stream returned to site and a destruction pathway documented for the regulator.
This is the same platform Nelson has used on hydrocarbon, PFAS, and mixed-waste mandates. Dioxin destruction uses the same physics with additional stack testing, dioxin-specific confirmation sampling, and quality assurance layered on top.
Proof: Nelson has operated on legacy dioxin residues at internationally-recognized sites, including sustained work on legacy dioxin residues in Vietnam. Project documentation available under NDA at scoping.
dioxins · Global / Defence Legacy
Send the matrix, approximate volume, location, and cleanup criteria. Nelson will identify the thermal route, verification requirements, and practical next step.
Nelson's international engagement is structured around mobilization of the RS-series platform with regional partner-of-record arrangements for permitting, logistics, and local regulatory submission. International dioxin work is part of the public project record.
Share the site location, assessments, contaminant profile and approximate soil quantity. Nelson can review the treatment and material-management requirements with your project team.
Qualified enquiry
Send the contaminant profile, approximate tonnage, and site location. Nelson will respond with the route that fits and the evidence needed to verify it.
dioxins · Other regions
Treatment approach · By contaminant
[1]Stockholm Convention on Persistent Organic Pollutants
[2]UNEP Guidelines on Best Available Techniques and Best Environmental Practices for unintentional POPs