dioxins · Vietnam
Vietnam's legacy dioxin residues at former US military installations and other historical sites represent one of the most internationally tracked persistent-organics remediation challenges in the world. The Law on Environmental Protection 2020[1] frames the domestic compliance environment; Vietnam is a Stockholm Convention party with destruction obligations for unintentional POPs[2]; UNEP BAT/BEP guidance[3] provides the operating benchmark.
Nelson has international project experience including work on legacy dioxin residues in Vietnam, documented on the Projects index.
Dioxins and furans are among the most persistent, most bioaccumulative, and most tightly regulated contaminants on any site inventory. Landfilling and stabilization do not break the aromatic chlorinated structure. They defer the liability into perpetuity.
Nelson operates RS-series high-temperature thermal desorption equipment engineered to drive dioxin-impacted soil to the temperatures and residence times required to destroy the parent compounds, with off-gas routed through a secondary high-temperature oxidizer and engineered acid-gas treatment train. The result is a verified clean soil stream returned to site and a destruction pathway documented for the regulator.
This is the same platform Nelson has used on hydrocarbon, PFAS, and mixed-waste mandates. Dioxin destruction uses the same physics with additional stack testing, dioxin-specific confirmation sampling, and quality assurance layered on top.
Proof: Nelson has operated on legacy dioxin residues at internationally-recognized sites, including sustained work on legacy dioxin residues in Vietnam. Project documentation available under NDA at scoping.
dioxins · Vietnam
Send the matrix, approximate volume, location, and cleanup criteria. Nelson will identify the thermal route, verification requirements, and practical next step.
Mandates coordinated through Nelson's international engagement with on-the-ground partner arrangements for permitting, traffic management, and language-specific regulatory submission.
Share the site location, assessments, contaminant profile and approximate soil quantity. Nelson can review the treatment and material-management requirements with your project team.
Qualified enquiry
Send the contaminant profile, approximate tonnage, and site location. Nelson will respond with the route that fits and the evidence needed to verify it.
dioxins · Other regions
Treatment approach · By contaminant
[1]Government of Vietnam — Law on Environmental Protection 2020
[2]Stockholm Convention on Persistent Organic Pollutants
[3]UNEP Guidelines on Best Available Techniques and Best Environmental Practices for unintentional POPs