AB
Province and territory drilldown
Confirmed release counts, the cleanup backlog still carrying an open file, and how the standards in Alberta decide when a petroleum site is finished.
Sites in the federal inventory
0
Published records with a location
Active obligation
0
Cleanup or monitoring still owed
Closed records
0 (0%)
Regulator has signed the file off
Highest priority sites
0
National classification 1, highest priority for action
0 sites in Alberta still carry an active federal cleanup obligation, and 0 of them have soil or groundwater recorded as an affected medium. Fuel storage, bulk handling and legacy defence infrastructure account for most petroleum impacted ground in the federal inventory.
A site can record more than one contaminant class, so these counts overlap.
Provincial, municipal and private sites are held in provincial registries and are not part of this count. Treat the federal inventory as a floor, not a full picture of Alberta.
Dated incidents reported to the regulator on federally regulated pipelines in Canada, most recent first. Each row shows the incident type exactly as the regulator recorded it. Releases are also labelled by phase: liquid releases can reach soil and groundwater, while gas releases vent to atmosphere and are reported by gas volume.
May 24, 2026MacklinRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner on behalf of NGTL Limited Partnership, natural gas - sweet, 1 m³ of gas vented. Status: Initially Submitted. Vented to atmosphere, no soil or groundwater pathway reported.
Jan 8, 2026ManningRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner on behalf of NGTL Limited Partnership, natural gas - sweet, 25,338 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Oct 29, 2025Sherwood Park, AlbertaRelease of SubstanceLiquid releaseEnbridge Pipelines Inc., diesel fuel, 17.9 m³ released. Status: Closed.
Jun 6, 2025SundreRelease of SubstanceAtmospheric, gasFoothills Pipe Lines Ltd., natural gas - sweet, 1,311 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
May 13, 2025HalkirkRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner on behalf of NGTL Limited Partnership, natural gas - sweet, 52.4 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Mar 19, 2025Manning, ABRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 11,018.99 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Mar 12, 2025Wandering River, ABRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 2,700 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Feb 7, 2025ManningRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 2,813 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Feb 3, 2025Westcott, ABRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 5,934.85 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Jan 28, 2025Wandering River, ABRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 1,400 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Jan 23, 2025EdsonRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 1,498.37 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Dec 12, 2024GlendonRelease of SubstanceAtmospheric, gasNGTL GP Ltd., as general partner, on behalf of NGTL Limited Partnership, natural gas - sweet, 96.5 m³ of gas vented. Status: Closed. Vented to atmosphere, no soil or groundwater pathway reported.
Gas releases (665 of them) are reported in cubic metres of gas, vent to atmosphere, and are excluded from the liquid volume above. They are reportable emissions rather than soil or groundwater contamination, so they carry an atmospheric label in the list. Dates are shown exactly as the regulator reported them, in UTC. Federally regulated pipelines only. Provincially regulated pipelines, rail, road and facility spills are reported elsewhere and are not in this file. Source: Canada Energy Regulator, pipeline incident data, Open Government Licence, Canada. Compiled 2026-08-16.
Alberta publishes generic Tier 1 numbers by land use and soil texture, and allows Tier 2 site specific adjustment where the exposure pathway can be shown to be inactive. Upstream oil and gas releases are reported to the Alberta Energy Regulator.
The CCME Canada-Wide Standard for Petroleum Hydrocarbons in Soil is the common backbone. It splits hydrocarbons into four fractions, F1 through F4, and sets numbers by land use, soil texture and depth. Provinces adopt it directly or fold it into their own tables.
The counts on this page come from the federal contaminated sites inventory, which covers sites the Government of Canada is responsible for. Provincial, municipal and private sites are managed under provincial registries and are not counted here.
Closure is decided against published generic criteria first. Where a site cannot meet them, a site specific risk assessment or a management plan with controls carries the file, signed by a qualified professional.
Regulator
Alberta Environment and Protected Areas, with the Alberta Energy Regulator for upstream oil and gas
Programme
Alberta Tier 1 and Tier 2 Soil and Groundwater Remediation Guidelines
Medium
Parameter
Threshold
Basis
Soil, residential and parkland, coarse
PHC Fraction 1 (C6 to C10)
210 mg/kg
CCME Canada-Wide Standard for Petroleum Hydrocarbons in Soil, Tier 1
Soil, residential and parkland, coarse
PHC Fraction 2 (>C10 to C16)
150 mg/kg
CCME Canada-Wide Standard for Petroleum Hydrocarbons in Soil, Tier 1
Soil, residential and parkland, coarse
PHC Fraction 3 (>C16 to C34)
1,300 mg/kg
CCME Canada-Wide Standard for Petroleum Hydrocarbons in Soil, Tier 1
Soil, residential and parkland, coarse
PHC Fraction 4 (>C34)
5,600 mg/kg
CCME Canada-Wide Standard for Petroleum Hydrocarbons in Soil, Tier 1
Drinking water
Benzene
5 µg/L
Guidelines for Canadian Drinking Water Quality, maximum acceptable concentration
Public agency records, compiled by Nelson.
These are reference thresholds, not a substitute for the jurisdiction's current tables. Numbers change, and site specific criteria can be set higher or lower once land use, depth and receptors are confirmed. Always work from the agency source linked below.
Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.
Alberta Tier 1 and Tier 2 guidelines
CCME Canada-Wide Standard for Petroleum Hydrocarbons in Soil
Federal Contaminated Sites Inventory, source of the site counts on this page
Guidelines for Canadian Drinking Water Quality
Nelson has treated hydrocarbon impacted soil for more than thirty years, from gasoline and diesel through heavy fuel oil and refinery sludge. If a site in Alberta needs a treatment path, our team can walk you through the options.
BCBritish ColumbiaContaminated Sites Regulation under the Environmental Management Act
MBManitobaContaminated Sites Remediation Act and storage tank regulation
NBNew BrunswickAtlantic RBCA, petroleum impacted sites
NLNewfoundland and LabradorAtlantic RBCA, petroleum impacted sites
NSNova ScotiaAtlantic RBCA and Contaminated Sites Regulations
NTNorthwest TerritoriesCCME standards applied through territorial and federal processes
NUNunavutCCME standards applied through territorial and federal processes
ONOntarioOntario Regulation 153/04, records of site condition
PEPrince Edward IslandAtlantic RBCA, petroleum impacted sites
Contact
Project inquiries, technical consultation, or emergencies.
We respond to project inquiries within one business day.
Nelson Environmental Remediation
Head Office
30541 - 100 Avenue
Acheson (Edmonton), Alberta
Canada T7X 6L8
Phone
Toll Free: 1.888.960.8222
Fax
1.780.962.6885