FL
State Regulatory Brief
EPA Region 4
Federal MCL adopted; FDEP Provisional CTLs for cleanup; heavy DoD site burden.
Florida operates a two-track PFAS system: federal MCLs for drinking water and FDEP Provisional Cleanup Target Levels for site remediation. Peninsula geology and the density of active military airfields make the response inventory large and technically demanding.
Agency
Florida Department of Environmental Protection (FDEP)
Primary Statute
F.A.C. Chapter 62-550 (drinking water); Chapter 62-780 (contaminated site cleanup)
Rule Adopted
Federal MCL adopted 2024; PCTLs in place
Compliance
2029-04-26 (EPA proposed changes on 18 May 2026 that are not final)
Context
Florida implements the federal PFAS NPDWR through FDEP's drinking water program without a competing state MCL. Compliance monitoring runs on the federal 2025 to 2027 initial monitoring window with 2029 compliance.
For contaminated sites, FDEP has published Provisional Cleanup Target Levels for PFOA (70 ppt for groundwater) and PFOS with a broader menu now under revision to align with the federal MCLs. Chapter 62-780 governs the site rehabilitation process from initial site assessment through Site Rehabilitation Completion Order.
DoD installations across Florida, Eglin AFB, Tyndall AFB, Patrick SFB, Whiting Field, NAS Jacksonville, NAS Pensacola, MacDill AFB, Homestead ARB, carry substantial AFFF plumes. The Florida karst geology accelerates plume migration and complicates natural attenuation strategies.
Water supply in Florida is drawn largely from the Floridan and Biscayne aquifers, both of which are shallow, transmissive and closely connected to surface water. That makes source protection the practical control: utilities have moved wellfields, blended supply and installed granular activated carbon rather than wait for plume capture. Municipal solid waste landfills add a second pressure point, since leachate carrying PFAS is routed to publicly owned treatment works that were never designed to remove it.
Numbers
Compound
Florida
Federal (2024 NPDWR)
Note
PFOA70 PCTL (GW)4 pptPCTL under revision
PFOS70 PCTL (GW)4 ppt
PFHxSFederal10 ppt
PFNAFederal10 ppt
ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.
History
2022FDEP publishes Provisional CTLs for PFOA and PFOS.
2024-06Federal NPDWR effective; FDEP implements through Chapter 62-550.
2025-2027Initial monitoring window for Florida PWS.
2026-2028Anticipated PCTL revision to align with federal MCLs.
Case Docket
ongoing
AFFF plumes across the Eglin reservation impact multiple ranges; Air Force CERCLA response with FDEP concurrence continues.
ongoing
PFAS plumes at the active NAS and former Cecil Field NAS reach off-base residential wells; Navy lead PRP with FDEP site coordination.
ongoing
PFAS investigation continues at Tyndall AFB alongside Hurricane Michael reconstruction; Air Force lead.
Compliance
Chapter 62-780 Site Rehabilitation with SRCOs.
Voluntary Cleanup Tax Credit Program.
FDEP Industrial Wastewater Permits (NPDES delegated) with PFAS conditions for high-strength dischargers.
Air construction permits for on-site thermal destruction units.
Obligations
PWS initial monitoring 2025 to 2027 per federal rule.
Chapter 62-780 site characterization for confirmed releases.
DoD federal facility schedules for base cleanups.
FAQ
Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.
See all 51 US jurisdictions in the PFAS Regulatory Tracker →
Contact
Project inquiries, technical consultation, or emergencies.
We respond to project inquiries within one business day.
Nelson Environmental Remediation
Head Office
30541 - 100 Avenue
Acheson (Edmonton), Alberta
Canada T7X 6L8
Phone
Toll Free: 1.888.960.8222
Fax
1.780.962.6885