PFAS Regulatory Tracker

IL

State Regulatory Brief

EPA Region 5

Illinois PFAS Regulations: Adopted Groundwater Standards & the Statewide PFAS Investigation

Adopted groundwater quality standards under 35 Ill. Adm. Code 620 (R22-18); statewide investigation of 1,700+ PWS; Sauget / Chicago legacy site dockets active.

Illinois EPA operates one of the country's most extensive statewide PFAS occurrence investigations. The Illinois Pollution Control Board adopted amendments to 35 Ill. Adm. Code 620 in docket R22-18, effective March 28, 2025, setting groundwater quality standards for six PFAS compounds. Public water systems in Illinois follow the federal drinking water rule. Enforcement continues at legacy Sauget-area and Chicago-region industrial sites.

Agency

Illinois EPA; Illinois Pollution Control Board (IPCB)

Primary Statute

415 ILCS 5 (Environmental Protection Act); 35 Ill. Adm. Code Part 620 (groundwater quality standards, docket R22-18); Part 611 (drinking water)

Rule Adopted

Groundwater quality standards adopted by IPCB in docket R22-18, effective March 28, 2025

Compliance

Groundwater quality standards in force since March 28, 2025; public water systems follow the federal MCL, in force from 2029 (EPA proposed changes on 18 May 2026 that are not final)

Context

Regulatory Overview

The Illinois Pollution Control Board adopted amendments to 35 Ill. Adm. Code 620 in docket R22-18, effective March 28, 2025, setting groundwater quality standards for six PFAS compounds (PFOA 4 ppt, PFOS 4 ppt, PFHxS 10 ppt, PFNA 10 ppt, PFBS 2,000 ppt, HFPO-DA 10 ppt), with the same values for Class I and Class II groundwater. Five of the six match the federal MCLs, and PFBS is set as a flat 2,000 ppt rather than through a Hazard Index. These are groundwater quality standards, not drinking water MCLs; public water systems in Illinois follow the federal rule.

The statewide PFAS occurrence investigation, begun in 2020 and covering 1,700+ community and non-community public water systems, is one of the most comprehensive in the country. Results drove interim treatment installations at multiple community water systems and informed the proposed MCL package.

Enforcement is active in the historically industrial Sauget / East St. Louis corridor and at Chicago-region legacy manufacturing and DoD sites (Naval Station Great Lakes, former Joliet Arsenal). Class B AFFF training discharges are restricted under PA 102-0290.

Numbers

State MCL vs Federal MCL

Compound

Illinois

Federal (2024 NPDWR)

Note

PFOA4 (adopted GW standard)4 ppt

PFOS4 (adopted GW standard)4 ppt

PFHxS10 (adopted GW standard)10 ppt

PFNA10 (adopted GW standard)10 ppt

PFBS2000 (adopted GW standard)Mixture only

HFPO-DA10 (adopted GW standard)10 ppt

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2020Illinois EPA statewide PFAS investigation launched.

2021-08PA 102-0290 restricts Class B AFFF training discharges.

2021-2023Guidance levels published; interim treatment installations at multiple PWS.

2023-2024Groundwater quality standard rulemaking filed with IPCB in docket R22-18.

2024-06Federal NPDWR effective; public water systems follow the federal rule.

2025-03IPCB adopts amendments to 35 Ill. Adm. Code 620 in docket R22-18, effective March 28, 2025.

Case Docket

Notable Enforcement & Response Cases

2020 to date

Sauget / East St. Louis industrial corridor

Multiple legacy chemical manufacturers in the Sauget corridor face PFAS-inclusive corrective action under Illinois EPA oversight. Investigations tie back to decades of fluorochemical manufacturing and disposal in the Mississippi floodplain.

2018 to date

Naval Station Great Lakes

AFFF investigations at the country's only Navy boot camp with Illinois EPA participation under DoD PFAS program.

2021 to date

City of Rockford / Winnebago County wellfields

Detections at municipal wells drove interim GAC installations and permanent treatment planning under Illinois EPA compliance schedules.

Public source

Compliance

Permit & Cleanup Pathways

Site Remediation Program (SRP) under TACO (35 IAC 742) with PFAS-inclusive Remediation Objectives.

NPDES permit reissuance with emerging PFAS conditions for industrial and municipal dischargers.

Solid waste program approvals under 35 IAC 807/810/811 for PFAS-impacted media disposition.

Bureau of Air permits under 35 IAC 201 for thermal destruction equipment.

Obligations

Sampling & Reporting

PWS federal MCL compliance monitoring 2025 to 2027; state investigation sampling continues.

Site Remediation Program sampling under any confirmed PFAS release.

PA 102-0290 AFFF inventory and phase-out reporting.

FAQ

Frequently Asked Questions

Are the Illinois PFAS standards enforceable?
Yes, as groundwater quality standards. The Illinois Pollution Control Board adopted amendments to 35 Ill. Adm. Code 620 in docket R22-18, effective March 28, 2025. They are not drinking water MCLs; public water systems in Illinois follow the federal rule.
How strict are the adopted groundwater standards vs. federal drinking water values?
The adopted PFOA groundwater standard (2 ppt) is stricter than the federal drinking water MCL of 4 ppt; the adopted PFOS groundwater standard (14 ppt) is less strict than the federal 4 ppt drinking water MCL. The two standards address different media, groundwater versus drinking water, and both apply.
What is the scope of the statewide investigation?
Illinois EPA sampled 1,700+ community and non-community PWS between 2020 and 2023, producing one of the most comprehensive state-level occurrence datasets in the country. Results are publicly available and drive prioritization of treatment and enforcement.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

Illinois EPA PFAS Portal

IPCB Adopted PFAS Groundwater Standards (R22-18)

PA 102-0290 (AFFF)

US EPA PFAS NPDWR

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • PFAS and the changing landscape: What site owners should know
  • LNAPL remediation regulations: How to identify the requirements for your site
  • Alberta Tier 1 soil and groundwater remediation guidelines: How to assess their applicability
  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson