PFAS Regulatory Tracker

MI

State Regulatory Brief

EPA Region 5

Michigan PFAS Regulations: The 7-Compound MCL & MPART Framework

Seven individual PFAS MCLs; MPART inter-agency authority; 300+ investigation sites tracked.

Michigan runs the most comprehensive state PFAS program in the country, seven individual MCLs, a governor-created inter-agency response team (MPART) with statutory authority, and cleanup criteria set under Part 201 of NREPA. It remains the reference regime for other states.

Agency

Michigan Department of Environment, Great Lakes, and Energy (EGLE); MPART

Primary Statute

R 325.10604g (drinking water); NREPA Part 201 (cleanup); Part 31 (surface water)

Rule Adopted

MCLs effective August 3, 2020

Compliance

In force; federal MCL layered from 2029 (EPA proposed changes on 18 May 2026 that are not final)

Context

Regulatory Overview

Michigan adopted enforceable MCLs for seven PFAS compounds in August 2020, more than any other state. The rulemaking followed the 2017 discovery of severe contamination at Wolverine Worldwide's tannery sites in northern Kent County and rapidly escalating investigations at former Wurtsmith AFB, the North Kent Sewer Authority, and dozens of other legacy sites.

MPART, the Michigan PFAS Action Response Team, is unusual: created by executive order in 2017 and codified in 2019, it coordinates EGLE, MDHHS, MDARD, DNR, LARA, and the AG in a single site-response engine with a public sites tracker. As of 2026 more than 300 sites are under investigation or remediation.

EGLE's Part 201 cleanup criteria for PFAS compounds set numeric soil and groundwater targets that drive site closures and inform natural resource damage claims. Part 31 surface water standards apply to industrial discharges.

Numbers

State MCL vs Federal MCL

Compound

Michigan

Federal (2024 NPDWR)

Note

PFOA8 ppt4 ppt

PFOS16 ppt4 ppt

PFNA6 ppt10 ppt

PFHxA400,000 pptNot regulated

PFHxS51 ppt10 ppt

PFBS420 pptMixture only

HFPO-DA (GenX)370 ppt10 ppt

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2017-11MPART created by Executive Directive 2017-4.

2018-01Wolverine Worldwide investigation begins; DEQ orders response.

2019-06MPART codified in state law (P.A. 101 of 2019).

2020-08Seven PFAS MCLs effective under R 325.10604g.

2021-05Part 201 cleanup criteria for PFAS finalized.

2023-033M settlement in Wolverine matter includes long-term treatment funding.

2024-06Federal NPDWR effective; PFAS Sampling Initiative continues.

Case Docket

Notable Enforcement & Response Cases

2018 to 2023

Wolverine Worldwide / 3M, Kent County

Historic tannery sludge dumping contaminated hundreds of residential wells. Consent decree required whole-house filtration, municipal water extension, and long-term monitoring; 3M settled with Wolverine in 2023 to fund remediation.

Public source

ongoing

Former Wurtsmith AFB, Oscoda

AFFF plumes on the former base remain among the largest DoD PFAS response sites. EGLE, MPART, and USAF operate under Federal Facility Agreements with treatment systems and off-base whole-house filtration.

2018 to date

Ann Arbor & Huron River foam advisories

Discharges from an upstream industrial source triggered do-not-eat-fish advisories along the Huron River watershed; EGLE enforcement produced source elimination and continued monitoring.

Compliance

Permit & Cleanup Pathways

IPP (Industrial Pretreatment Program) PFAS monitoring, Michigan pioneered statewide IPP PFAS surveys.

Part 201 Baseline Environmental Assessment for site transfers with PFAS presence.

NPDES permit special conditions with PFAS effluent limits for high-strength sources.

Air Use Permits from EGLE AQD for thermal destruction units.

Obligations

Sampling & Reporting

Annual PWS compliance monitoring for all seven regulated compounds.

IPP source-sector monitoring for chrome platers, waste-to-energy, landfill leachate, centralized waste treaters.

Part 201 site characterization triggered by any confirmed release.

FAQ

Frequently Asked Questions

Why does Michigan have seven MCLs when the federal rule regulates six?
Michigan adopted its rule in 2020 based on its own toxicological review, before the federal NPDWR existed. The seven-compound state list includes PFHxA and does not use the federal Hazard Index; both regimes now apply concurrently.
Is MPART a regulator?
MPART itself is a coordinating team, not a permitting authority, the underlying regulatory powers stay with EGLE, MDHHS, MDARD, and others. But MPART directs which sites are prioritized and how response is sequenced.
Do Michigan's IPP PFAS surveys apply to all industrial users?
Not all, EGLE targeted sectors with known PFAS-use histories (metal finishing, landfills, centralized waste treatment, WTE). POTWs then extend monitoring to their significant industrial users.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

MPART Portal

EGLE Drinking Water PFAS Rule

Part 201 Cleanup Criteria

US EPA PFAS NPDWR

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • PFAS and the changing landscape: What site owners should know
  • LNAPL remediation regulations: How to identify the requirements for your site
  • Alberta Tier 1 soil and groundwater remediation guidelines: How to assess their applicability
  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson