PFAS Regulatory Tracker

NC

State Regulatory Brief

EPA Region 4

North Carolina PFAS Regulations: The Chemours Consent Order & Cape Fear Response

GenX Consent Order remains the national reference; DEQ provisional health goals; federal MCL layered from 2029.

North Carolina anchors US GenX enforcement. The Cape Fear River Chemours Consent Order, active since 2019, established the template for producer-financed PFAS destruction, drinking water treatment funding, and long-term monitoring.

Agency

North Carolina Department of Environmental Quality (DEQ)

Primary Statute

NCGS Chapter 143, Article 21; Consent Order 17 CVS 580 (Bladen Co. Superior Court)

Rule Adopted

Consent Order signed February 25, 2019; ongoing amendments

Compliance

Consent Order milestones ongoing; federal MCL 2029 (EPA proposed changes on 18 May 2026 that are not final)

Context

Regulatory Overview

North Carolina has not adopted numeric drinking-water MCLs. Instead, DEQ enforces PFAS reductions through a combination of a provisional health goal for GenX (HFPO-DA) at 140 ppt, set by NCDHHS in July 2017, federal MCLs, and the Consent Order regime against Chemours at the Fayetteville Works. The 70 ppt PFOA and PFOS figures referenced below are the superseded 2016 EPA lifetime health advisory, not state standards.

The Consent Order, as amended multiple times through 2024, requires Chemours to fund permanent drinking-water solutions for homes with PFAS-impacted wells, install thermal oxidizer capacity to destroy air emissions, and monitor Cape Fear River water quality. It has become the reference framework for producer-responsibility PFAS enforcement nationally.

The Cape Fear Public Utility Authority, serving greater Wilmington, completed one of the largest municipal GAC treatment installations in the country in response to Cape Fear River source contamination. Costs are being litigated against Chemours and DuPont.

Numbers

State MCL vs Federal MCL

Compound

North Carolina

Federal (2024 NPDWR)

Note

PFOA70 (2016 EPA advisory, superseded)4 ppt

PFOS70 (2016 EPA advisory, superseded)4 ppt

HFPO-DA (GenX)140 (health goal)10 ppt

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2017-06GenX detected in Cape Fear River finished drinking water.

2018-11Notice of Violation issued to Chemours for air emissions.

2019-02Consent Order 17 CVS 580 signed in Bladen County Superior Court.

2020-08Addendum requires additional treatment at Fayetteville Works.

2022-08Second Addendum expands off-site well remediation.

2023-2024Chemours pilot destruction (thermal oxidation) achieves >99.99% DRE.

2024-06Federal NPDWR effective; layered on state framework.

Case Docket

Notable Enforcement & Response Cases

2019 to date

Chemours Fayetteville Works Consent Order

Court-enforceable order requiring Chemours to fund whole-house filtration for affected private wells, install air-emissions destruction technology, and remediate the Cape Fear River. The order remains the reference producer-responsibility PFAS action in the US.

Public source

2018 to 2022

CFPUA / City of Wilmington GAC Installation

Cape Fear Public Utility Authority installed 40+ MGD GAC treatment following Cape Fear River source contamination; costs being recovered from Chemours and DuPont.

ongoing

Camp Lejeune / Marine Corps

PFAS investigations at Camp Lejeune supplement long-standing legacy contamination response under DoD CERCLA authority.

Compliance

Permit & Cleanup Pathways

Inactive Hazardous Sites Response Act voluntary cleanup pathway.

NCDEQ air permits with 99.99%+ DRE requirements for PFAS thermal destruction.

NPDES permit conditions for direct dischargers with PFAS process wastewater.

Solid waste permits for on-site treatment residuals management.

Obligations

Sampling & Reporting

PWS initial federal monitoring 2025 to 2027.

Consent Order mandatory sampling for Chemours (air, water, soil, and off-site wells).

IHSB site assessments for confirmed releases at non-federal sites.

FAQ

Frequently Asked Questions

Why is the Chemours Consent Order significant nationally?
It was the first court-enforceable order requiring a major PFAS producer to fund permanent drinking water treatment, install air-emissions destruction technology, and remediate a major watershed at its own expense, establishing the template other states have since pursued.
Does North Carolina have PFAS MCLs?
Not as state-adopted MCLs. DEQ enforces PFAS through the federal MCL (from 2029), a provisional GenX health goal, and the Chemours Consent Order regime.
What DRE is required for PFAS destruction in North Carolina?
The Consent Order and DEQ air permits for the Fayetteville Works oxidizer target 99.99% or greater destruction and removal efficiency; broader state guidance is converging on similar performance for PFAS thermal treatment.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

NC DEQ GenX Investigation

Chemours Consent Order

NC DEQ PFAS Portal

US EPA PFAS NPDWR

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • PFAS and the changing landscape: What site owners should know
  • LNAPL remediation regulations: How to identify the requirements for your site
  • Alberta Tier 1 soil and groundwater remediation guidelines: How to assess their applicability
  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson