PFAS Regulatory Tracker

TX

State Regulatory Brief

EPA Region 6

Texas PFAS Regulations: TCEQ Framework, TRRP Cleanup & AFFF Response

Federal MCL adopted through TCEQ; large AFFF site inventory; TRRP cleanup with PCLs.

Texas defers to the 2024 federal PFAS MCLs but manages a large and complex PFAS site inventory dominated by military airfields, refineries, and legacy manufacturing. TCEQ's Texas Risk Reduction Program governs cleanup.

Agency

Texas Commission on Environmental Quality (TCEQ)

Primary Statute

30 TAC Chapter 290 (drinking water); 30 TAC Chapter 350 (TRRP)

Rule Adopted

Federal MCL adopted 2024

Compliance

2029-04-26 (EPA proposed changes on 18 May 2026 that are not final)

Context

Regulatory Overview

Texas has not adopted state-specific PFAS drinking-water MCLs. TCEQ implements the federal NPDWR through 30 TAC Chapter 290 with the standard federal compliance clock (initial monitoring by 2027, compliance by 2029).

The state's PFAS site inventory is dominated by Department of Defense installations: Ellington Field JRB (Houston), Joint Base San Antonio-Lackland, Dyess AFB (Abilene), Sheppard AFB (Wichita Falls), and Naval Air Station Corpus Christi. Each is on the DoD PFAS Task Force priority list with CERCLA response ongoing.

TRRP, the Texas Risk Reduction Program, governs non-DoD PFAS site cleanup with three response tiers based on land use and exposure. TCEQ has published PFAS Protective Concentration Levels (PCLs) that guide site closure decisions.

Industrial sources matter as much as the airfields here. The Gulf Coast refining and petrochemical corridor from Houston to Beaumont uses large volumes of Class B foam at tank farms and process units, and several fire training areas along the Ship Channel have PFAS in shallow groundwater. Texas also has no state PFAS product ban, so the disposal question falls to waste characterization rather than a phase-out schedule, and generators rely on TCEQ waste codes and commercial capacity to move impacted media.

Numbers

State MCL vs Federal MCL

Compound

Texas

Federal (2024 NPDWR)

Note

PFOAFederal4 ppt

PFOSFederal4 ppt

PFHxSFederal10 ppt

PFNAFederal10 ppt

HFPO-DAFederal10 ppt

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2020-2022TCEQ TRRP PCLs updated to include PFAS compounds.

2023TCEQ PFAS sampling of statewide PWS sources.

2024-06Federal NPDWR effective in Texas via 30 TAC Chapter 290 adoption.

2025-2027Initial monitoring window for Texas PWS.

Case Docket

Notable Enforcement & Response Cases

ongoing

Joint Base San Antonio-Lackland

AFFF plumes off-base impact private and municipal wells; Air Force CERCLA response with TCEQ concurrence continues.

ongoing

Ellington Field JRB / Houston

PFAS characterization and interim response continue at the joint reserve airfield under DoD-TCEQ coordination.

ongoing

Dyess AFB / Abilene

PFAS investigation and off-base drinking water assessments underway; Air Force lead PRP.

Compliance

Permit & Cleanup Pathways

TRRP Tier 1, 2, 3 closure with published PCLs.

TCEQ Voluntary Cleanup Program (VCP) for liability release.

TPDES permit special conditions for industrial dischargers.

TCEQ air authorizations for on-site thermal destruction.

Obligations

Sampling & Reporting

PWS initial monitoring 2025 to 2027 per federal rule.

TRRP affected property assessment for any confirmed release.

DoD site characterization on continuing federal facility schedules.

FAQ

Frequently Asked Questions

Does Texas have its own PFAS drinking-water standard?
Not yet. Texas implements the federal MCL through TCEQ's drinking water rules; the state has not published its own numeric standard.
What are Texas TRRP PCLs?
Protective Concentration Levels are numeric cleanup targets under the Texas Risk Reduction Program used to determine whether a site can be closed at Tier 1, or whether Tier 2/3 site-specific analysis is required.
Are DoD PFAS sites regulated by TCEQ?
Federal facilities operate under CERCLA with DoD as lead PRP; TCEQ concurrence and enforcement authority applies to off-base impacts and treatment approvals.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

TCEQ PFAS

30 TAC Chapter 290

TRRP Rule (30 TAC 350)

US EPA PFAS NPDWR

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • PFAS and the changing landscape: What site owners should know
  • LNAPL remediation regulations: How to identify the requirements for your site
  • Alberta Tier 1 soil and groundwater remediation guidelines: How to assess their applicability
  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson