Wisconsin PFAS Regulations: NR 809 MCLs, the Spills Law & Marinette Response

NR 809 adopts federal-aligned individual PFAS MCLs from July 2026; Spills Law applies to PFAS (WI Sup. Ct. 2024); Marinette / JCI-Tyco docket active.

Wisconsin operates PFAS enforcement under two authorities: NR 809 drinking water MCLs and the state Spills Law (§292.11), which the WI Supreme Court confirmed in 2024 applies to PFAS releases as hazardous substances. Rule CR 25-068 revised NR 809 effective July 1, 2026 to adopt the federal individual MCLs. The Marinette / JCI / Tyco fire training center docket is the state's defining enforcement action.

Agency

Wisconsin Department of Natural Resources (DNR); Department of Health Services (DHS)

Primary Statute

Wis. Stat. §292.11 (Spills Law); NR 809 (drinking water); NR 140 (groundwater); Wis. Act 101 (2019)

Rule Adopted

NR 809 sum-of-PFOA+PFOS MCL 70 ppt effective August 2022 (superseded); Rule CR 25-068 revised NR 809 to adopt federal individual MCLs, effective July 1, 2026; Spills Law applicability confirmed 2024

Compliance

In force; federal MCL layered 2029 (EPA proposed changes on 18 May 2026 that are not final)

Context

Regulatory Overview

DNR adopted an enforceable drinking water MCL of 70 ppt for the sum of PFOA and PFOS under NR 809 in 2022. Rule CR 25-068, published June 29, 2026 and effective July 1, 2026, revised NR 809 to replace that combined standard with the federal individual MCLs: PFOA 4 ng/L, PFOS 4 ng/L, PFHxS 10 ng/L, PFNA 10 ng/L, HFPO-DA 10 ng/L, and a Hazard Index of 1. Additional PFAS surface water criteria under NR 105 (PFOA 20 ppt, PFOS 8 ppt for public health protection) apply to point source discharges.

Wisconsin's Spills Law (Wis. Stat. §292.11) has become the operative PFAS enforcement authority. In Wisconsin Manufacturers & Commerce v. DNR (2024), the Wisconsin Supreme Court confirmed DNR's authority to require investigation and remediation of PFAS releases as hazardous substances under §292.11, resolving several years of litigation and reopening a large enforcement docket.

The Marinette / Peshtigo enforcement action against Johnson Controls International and Tyco Fire Products, arising from decades of AFFF testing at the JCI/Tyco Fire Technology Center, remains the state's defining PFAS docket, driving whole-house filtration for hundreds of private wells and long-term groundwater remediation.

Numbers

State MCL vs Federal MCL

Compound

Wisconsin

Federal (2024 NPDWR)

Note

PFOA4 ppt4 pptNR 809 adopted federal individual MCL July 2026; superseded 70 ppt combined standard applied 2022-2026

PFOS4 ppt4 ppt

PFHxS10 ppt10 ppt

PFNA10 ppt10 ppt

HFPO-DA10 ppt10 ppt

PFOA (surface water)20 pptNot regulated

PFOS (surface water)8 pptNot regulated

ppt = parts per trillion (ng/L). Where a state number is stricter, the state number controls; where the federal number is stricter, the federal number controls for public water systems.

History

Rulemaking & Response Timeline

2013Marinette / Peshtigo PFAS contamination first documented at JCI Fire Technology Center.

2019-11Act 101 signed, appropriations and PFAS response authority strengthened.

2022-08NR 809 sum-of-PFOA+PFOS 70 ppt MCL effective; NR 105 surface water criteria adopted.

2026-07Rule CR 25-068 revises NR 809 to adopt federal individual MCLs (PFOA 4, PFOS 4, PFHxS 10, PFNA 10, HFPO-DA 10 ng/L, Hazard Index 1), replacing the 70 ppt combined standard.

2022-2023WMC v. DNR litigation on Spills Law applicability.

2024-06Wisconsin Supreme Court confirms Spills Law applies to PFAS.

2024-06Federal NPDWR effective; NR 809 preserved.

Case Docket

Notable Enforcement & Response Cases

2013 to date

Johnson Controls / Tyco Fire Technology Center, Marinette / Peshtigo

Decades of AFFF testing at the JCI/Tyco Fire Technology Center contaminated groundwater across a broad Marinette/Peshtigo footprint. Enforcement under Wis. Stat. §292.11 compelled JCI/Tyco to fund whole-house filtration for hundreds of private wells, install groundwater extraction and treatment, and pursue long-term remediation. Class action litigation resolved with additional payments to affected residents.

Public source

2022 to date

City of Wausau, municipal wellfield response

Detections above the NR 809 MCL forced Wausau to install temporary treatment on multiple municipal wells; permanent GAC treatment in design.

2020 to date

La Crosse Regional Airport / French Island

AFFF investigations at LSE and French Island drove community PFAS exposure response; interim bottled water and long-term treatment planning ongoing.

Compliance

Permit & Cleanup Pathways

Wis. Stat. §292.11 Spills Law, reporting and remediation for any PFAS release above reportable quantities.

WPDES permit conditions with PFAS numeric limits derived from NR 105 surface water criteria.

NR 500 series solid waste program approval for PFAS-impacted media disposition.

Air permits under NR 405 / NR 445 for thermal destruction; NR 445 hazardous air pollutant analysis relevant.

Obligations

Sampling & Reporting

PWS quarterly monitoring under NR 809 MCL, now aligned with the federal individual PFAS MCLs.

Spills Law investigation sampling on any confirmed release.

WPDES-permitted dischargers face PFAS characterization and, on reissuance, numeric limits.

FAQ

Frequently Asked Questions

Does the Spills Law really apply to PFAS?
Yes. The Wisconsin Supreme Court confirmed in 2024 that DNR has authority under Wis. Stat. §292.11 to require investigation and remediation of PFAS releases as hazardous substances, resolving several years of litigation and reopening a large enforcement docket.
How does NR 105 differ from NR 809?
NR 809 sets drinking water MCLs, now the federal individual values (PFOA 4, PFOS 4, PFHxS 10, PFNA 10, HFPO-DA 10 ng/L, Hazard Index 1) following Rule CR 25-068 effective July 1, 2026. NR 105 sets surface water criteria (20 ppt PFOA, 8 ppt PFOS) for public health protection, applied to point-source discharges to surface waters through WPDES permits.
What is the status of the Marinette response?
Whole-house filtration remains operative for hundreds of private wells; JCI/Tyco continues source-area extraction and treatment; class action monetary settlements are largely resolved. DNR oversight under §292.11 continues on a long-term stewardship footing.

Primary Sources

Data not supplied by Nelson. Every figure comes from public regulator records published by the agencies cited. Nelson compiles, maps and links the records, and does not create, verify, adjust or own the underlying data. This hub is a free public resource published to share knowledge. Every figure traces to a government dataset a reader can download and re-check, the sources are listed in the methodology, and nothing here is gated behind a form. Dataset compilation copyright 2026 Nelson Environmental Remediation Ltd. All rights reserved. Source attribution required for reuse. Data licence and citation.

WI DNR PFAS

NR 809 (drinking water)

Marinette / Peshtigo Response

WMC v. DNR (2024)

US EPA PFAS NPDWR

Other State Briefs

ALAlabamaFederal MCL implemented by ADEM; the pressure comes from Decatur-area manufacturing history and AFFF sites, not from a state number.

AKAlaskaFederal MCL for drinking water, state cleanup levels under 18 AAC 75, and logistics that make on site treatment the practical answer.

AZArizonaFederal MCL implemented by ADEQ, backed by one of the more thorough state sampling programmes and a long-running Tucson-area groundwater plume.

ARArkansasFederal MCL only; the site work sits at Little Rock Air Force Base, Ebbing Air National Guard Base and industrial legacy properties.

CACaliforniaSix-analyte notification framework; state MCLs in rulemaking; DTSC designating PFAS-containing wastes as hazardous.

COColoradoReg 31 groundwater and surface water standards; no state drinking water MCL; HB22-1345 product bans; Peterson SFB / Widefield AFFF community response ongoing.

See all 51 US jurisdictions in the PFAS Regulatory Tracker →

Contact

How can we help?

Project inquiries, technical consultation, or emergencies.

We respond to project inquiries within one business day.

Nelson Environmental Remediation

Head Office

30541 - 100 Avenue

Acheson (Edmonton), Alberta

Canada T7X 6L8

Phone

1.780.960.3660

Toll Free: 1.888.960.8222

Fax

1.780.962.6885

Email

Follow Us on LinkedIn →

More from Nelson

  • PFAS and the changing landscape: What site owners should know
  • LNAPL remediation regulations: How to identify the requirements for your site
  • Alberta Tier 1 soil and groundwater remediation guidelines: How to assess their applicability
  • Mobile thermal technology: configured for the material, brought to site
  • How to use The Hub for contamination research
  • Navigator: a practical guide to remediation strategy
  • The Ground Truth: Warren Nelson's remediation newsletter
  • A new era of enlightenment
  • Value should be the final outcome
  • What’s next at Nelson
  • Why independent research matters more than anything
  • Over thirty years of permanent outcomes: a field review of Nelson’s project record

Site Navigation

  • All Articles & Research
  • Thermal Remediation Capabilities
  • Project Case Studies
  • Remediation Glossary
  • About Nelson Environmental Remediation
  • Contact Nelson