hydrocarbons · Texas
Texas regulates contaminated sites under the Texas Commission on Environmental Quality (TCEQ) using the Texas Risk Reduction Program (TRRP)[1] and the Railroad Commission of Texas for upstream oil and gas waste[2]. Hydrocarbon volumes from the Permian Basin, Eagle Ford, and the Gulf Coast refining complex generate one of the largest hydrocarbon-impacted soil inventories in North America.
Hydrocarbon-impacted soil is one of the most common, and most mishandled, remediation streams on the continent. The default in many jurisdictions is still excavate and haul to landfill, which moves the carbon liability downstream rather than resolving it, and increasingly fails the permanence test regulators apply at closure.
Nelson operates the RS-series mobile thermal desorption fleet engineered to drive hydrocarbon-impacted soil to the temperatures and residence times required to volatilize and destroy the hydrocarbon fraction, with off-gas routed through a high-temperature oxidizer and engineered treatment train. Clean soil is returned to the site, with confirmation sampling and a destruction record the regulator can close the file against.
The same physics that destroys hydrocarbons destroys dioxins, fly ash residues, and the carbon-fluorine bonds in PFAS. Hydrocarbon work is the deepest part of Nelson's portfolio and the foundation of the equipment platform.
Proof: Nelson's hydrocarbon destruction track record includes the Tioga, North Dakota cleanup (verified clean-soil return on a high-profile crude release) and the Bear Hills, Alberta program (multi-award-winning thermal remediation at scale). Project documentation is linked from the Projects index.
hydrocarbons · Texas
Send the matrix, approximate volume, location, and cleanup criteria. Nelson will identify the treatment route, evidence requirements, and practical next step.
Texas mandates are scoped from the Seattle office with thermal equipment dispatched cross-border for projects that justify the haul. Partner-of-record arrangements are structured for state-level permitting and traffic management.
Share the site location, assessments, contaminant profile and approximate soil quantity. Nelson can review the treatment and material-management requirements with your project team.
Qualified enquiry
Send the contaminant profile, approximate tonnage, and site location. Nelson will respond with the route that fits and the evidence needed to verify it.
hydrocarbons · Other regions
New Brunswick & Atlantic Canada
Treatment approach · By contaminant
[1]Texas Risk Reduction Program (TRRP), TCEQ
[2]Railroad Commission of Texas, Oil and Gas Division
Environmental remediation services in Canada and the United States
Hydrocarbon remediation services: 30+ years of treatment experience